Fujitsu Oracle SPARC M12-2 Service Manual page 213

Hide thumbs Also See for Oracle SPARC M12-2:
Table of Contents

Advertisement

6.1.2
Active/Hot Removal Workflow of the HDD/SSD
Before removing the HDD/SSD, see
Precautions for FRU
Table 6-2
Table 6-2     Active/Hot Removal Procedure of the HDD/SSD
Work
Order
1
2
3
4
5
6
7
8
9
10
*1 Reassign I/O resources to logical domains as required. For details, see "Chapter 3 Operations for Domain
Configuration" in the Fujitsu SPARC M12 and Fujitsu M10/SPARC M10 Domain Configuration Guide.
6.1.3
Active/Hot Removal Workflow of the PCI
Expansion Unit
Table 6-3
Reduction."
shows the workflow for active/hot removal of the HDD/SSD.
Task
Checking the operating condition of the
system
Checking the usage status of the
HDD/SSD to be removed
Releasing the HDD/SSD from the system
Confirming that you can remove the
HDD/SSD to be removed
Saving logical domain configuration
information
Switching the mode switch on the OPNL
to Service
Removing the HDD/SSD from the
SPARC M12-2/M12-2S
Checking the operating condition of the
physical partition and logical domains (*1)
Installing the filler unit in the SPARC
M12-2/M12-2S
Switching the mode switch on the OPNL
to Locked
shows the workflow for active/hot removal of a PCI expansion unit.
"Precautions for HDD/SSD
Reference
"9.2.1 Checking the Operation Status of
Physical Partitions and Logical
"9.2.3 Checking the Usage of the
HDD/SSD"
"9.4 Enabling the Removal of
"9.2.3 Checking the Usage of the
HDD/SSD"
"9.1.1 Saving Logical Domain
Configuration
"2.3.2 OPNL Control
"15.3.1 Removing an
"9.2.1 Checking the Operation Status of
Physical Partitions and Logical
"15.4.2 Installing a Filler
"2.3.2 OPNL Control
Chapter 6 FRU Removal Workflows
removal" in
"7.3
Domains"
Hardware"
Information"
Function"
HDD/SSD"
Domains"
Unit"
Function"
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents