Fujitsu Oracle SPARC M12-2 Service Manual page 173

Hide thumbs Also See for Oracle SPARC M12-2:
Table of Contents

Advertisement

Chapter 5
FRU Addition Workflows
This chapter describes addition workflows by type of maintenance for FRUs and the
PCI expansion unit mounted to the SPARC M12. For the installation and removal
procedures of each FRU, see
 
 
Active/Hot Addition Workflows
Active/Cold Addition Workflows
Inactive/Hot Addition Workflows
Inactive/Cold Addition Workflows
System-Stopped/Hot Addition Workflows
System-Stopped/Cold Addition Workflows
5.1
Active/Hot Addition Workflows
This section describes the workflows for active/hot addition of FRUs to the SPARC
M12.
Before performing addition work, be sure to check the notes on maintenance work in
the Fujitsu SPARC M12 Product Notes of the XCP version used.
Each of the following sections puts together the order of work and the tasks for each
FRU into a table. For details on each task, see the reference shown in the table.
The following FRUs are subject to active/hot addition:
PCIe card
HDD/SSD
PCI expansion unit
Chapter 11
and subsequent chapters.
151

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents