Fujitsu Oracle SPARC M12-2 Service Manual page 542

Hide thumbs Also See for Oracle SPARC M12-2:
Table of Contents

Advertisement

Figure 22-2     Accompanying Labels and Examples of Label Indications
3.
Place the server in the cold state.
To perform maintenance after every SPARC M12-2S was placed in the cold state
without using the maintenance menu, remove the power cords of every SPARC
M12-2S. For details on handling power cords, see
Cords."
Figure 22-3     Removing the Power Cord
Remove the XSCF BB control cable.
4.
Pull out the XSCF BB control cable (in the direction of arrow 2 in
520
Fujitsu SPARC M12-2/M12-2S Service Manual ・ January 2023
BB00-SCF0
BB00-SCF0
BB01-SCF0
BB01-SCF0
Examples of label indications
"9.8.2 Removing the Power
Figure 22-4
and

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents