Fujitsu Oracle SPARC M12-2 Service Manual page 211

Hide thumbs Also See for Oracle SPARC M12-2:
Table of Contents

Advertisement

Chapter 6
FRU Removal Workflows
This chapter describes removal workflows by type of maintenance for FRUs and the
PCI expansion unit mounted to the SPARC M12. For the installation and removal
procedures of each FRU, see
Active/Hot Removal Workflows
Active/Cold Removal Workflows
Inactive/Hot Removal Workflows
Inactive/Cold Removal Workflows
System-Stopped/Hot Removal Workflows
System-Stopped/Cold Removal Workflows
6.1
Active/Hot Removal Workflows
This section describes the workflows for active/hot removal of the FRUs mounted in
the SPARC M12-2/M12-2S.
Before performing removal work, be sure to check the notes on maintenance work in
the Fujitsu SPARC M12 Product Notes of the XCP version used.
Each of the following sections puts together the order of work and the tasks for each
FRU into a table. For details on each task, see the reference shown in the table.
The following FRUs are subject to active/hot removal:
PCIe card
HDD/SSD
PCI expansion unit
Chapter 11
and subsequent chapters.
189

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m12-2s

Table of Contents