CareFusion LTV 1200 Service Manual page 169

Table of Contents

Advertisement

Accumulator Installation:
1)
Attach a 3.70" long precut silicone tube (P/N 10458) onto the PEEP Pilot Pressure
Transducer port. Position the balance of the tube beside the Purge Solenoids, over
previously installed tubing, and under the Accumulator mounting tab on the
Manifold to Back Panel Spacer, as shown.
2)
Route the clear tube from the Flow Valve between the ventilator side panel
Exhalation Valve and Low Pressure ports, over previously installed tubing, and onto
Solenoid Manifold port # 5.
3)
Attach the tube from Solenoid Manifold port # 6 over the clear tube from the Flow
Valve and onto the ventilator side panel Exhalation Valve port.
Page 8-48
®
LTV
1200, 1150, and 1100 Ventilator Service Manual
p/n 18603-001, Rev. J

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ltv 1150Ltv 1100

Table of Contents