Keysight U7233A Testing Notes page 28

Ddr1 compliance test application
Table of Contents

Advertisement

2
Preparing to Take Measurements
If DDR1 Test does not appear in the Automated Test Apps menu, the DDR1 Compliance Test
NOTE
Application has not been installed (see
Application).
Figure 1
in the main pane, show the steps you take in running the automated tests:
Tab
Set Up
Select Tests
Configure
Connect
Run Tests
Results
HTML Report
When you close the DDR1 application, each channel's probe is configured as single-ended or
NOTE
differential depending on the last DDR1 test that was run.
28
shows the DDR1 Compliance Test Application main window. The task flow pane, and the tabs
Description
Lets you identify and setup the test environment, including information about the device
under test.
Lets you select the tests you want to run. The tests are organized hierarchically so you
can select all tests in a group. After tests are run, status indicators show which tests
have passed, failed, or not been run, and there are indicators for the test groups.
Lets you configure test parameters (like memory depth). This information appears in the
HTML report.
Shows you how to connect the oscilloscope to the device under test for the tests to be
run.
Starts the automated tests. If the connections to the device under test need to be
changed while multiple tests are running, the tests pause, show you how to change the
connection, and wait for you to confirm that the connections have been changed before
continuing.
Contains more detailed information about the tests that have been run. You can change
the thresholds at which marginal or critical warnings appear.
Shows a compliance test report that can be printed.
, "Installing the DDR1 Compliance Test
Chapter 1
DDR1 Compliance Testing Methods of Implementation

Advertisement

Table of Contents
loading

This manual is also suitable for:

U7233b

Table of Contents