FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
14.6 Commissioning the Management System (New Main
Way)
For details about how to configure devices in the management system, see iManager NetEco
Device Commissioning Guide-(NetEco Version) (The NetEco version depends on the version
in use. Click
For details about devices configured in the management system, see
Table 14-4 Devices configured in the management system of the equipment room
Category
New main way
Cooling
Monitoring
Issue 01 (2019-03-05)
on the NetEco WebUI to obtain the NetEco version in use. Click Download.).
Device
General input unit
Power distribution unit
NetCol5000-C 30 kW
VCN500
Server
Switch
ECC800
Access actuator
Cabinet electronic lock
Door status sensor
Access control device
Camera
WiFi converter
Skylight actuator
AC actuator
Audible and Visual Alarm
Water Sensor
Multi-functional sensor
Smoke detector
Pad
CIM
BIM
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14 Power-On Commissioning
Table
14-4.
198