FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 12-22 Base grounding diagram
(1) Base ground points
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
equipment room.
Connect one end of the base ground cable to any of the base ground points shown by (1)
in
bottom inside the cabinet, as shown in
cables by following instructions in
Figure 12-23 Connecting the ground cable between the base and cabinet
Issue 01 (2019-03-05)
Figure
12-22, and connect the other end to the general ground copper bar of the
Figure
12-22, and connect the other end to the ground copper bar at the rear door
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
12-23. Then connect the module ground
12.9.1 Grounding
Cabinets.
12 Cable Routing
186