FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 6-11 Installing a skylight magnetic lock
Step 2 Secure the lock magnet to the magnet fixing base using one M4x10 countersunk screw, as
shown by (2) in
Step 3 Secure the magnetic lock to the lock base using one M6x16 screw, as shown by (3) in
6-11.
Step 4 Secure the magnetic lock base to the rotating skylight using two M4x12 screws, as shown by
(4) in
----End

6.3 Installing End Doors

Table 6-1
Table 6-1 Pre-installation checklist
No.
1
2
3
4
Issue 01 (2019-03-05)
Figure
6-11.
Figure
6-11.
lists the items to be checked before end door installation.
Check Item
The cabinets are leveled. The height between the cabinet top and
the floor surface is 2000 mm (+3 mm).
The distance between cabinet doors and enclosure plates inside
the aisle containment is 1225 mm (± 3 mm).
The cabinets and enclosure plates at both ends of an smart module
are placed with a front-backward deviation no greater than 1.5
mm.
The height deviation between the floor surface and support top is
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Contained Aisles
Figure
Result
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
86