Figure 6-23 Installing the door box
Step 6 Secure the door box.
If the door box is evenly and properly placed as shown in
screws as shown by (2) in
7.
Figure 6-24 Door boxes in place
Step 7 Adjust the gaps.
After the door boxes are placed, the gaps between the door boxes and the posts may be
uneven and need to be adjusted, as shown in
Table 6-3 Door box placement faults
Fault Type
Door box tilted with a V-
Issue 01 (2019-03-05)
Figure
6-22. If the door box is tilted, adjust it as described in
Possible Cause
The top front and rear of the
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Contained Aisles
Figure
6-24, secure it using M5
Figure 6-25
and
Figure
Measure
For details about the
Step
6-27.