FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
When heating the screw threads, avoid burning the component and labels around.
Step 3 Install the side panels.
----End
4.2.4 Removing Transportation Fasteners for the Air Conditioner
Context
This step applies to the model with 1100 mm depth or 1200 mm depth, and electric heater or
water pump.
Issue 01 (2019-03-05)
Figure 4-30 Removing a plug and installing a conversion adapter
Routing pipes from the bottom is used as an example in
from the top.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Figure
4-30, and it is the same as routing pipes
47