FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Cabinet Installation Checklist
No.
1
2
3
4
5
6
7
8
9
10
Aisle Containment Checklist
No.
1
Issue 01 (2019-03-05)
C
Check Item
The cabinet layout is consistent with the equipment room
layout diagram.
The height deviation of all cabinets and the depth
deviation of adjacent cabinets are less than 5 mm.
All bolts are tightened, especially the bolts used for
electric connection. Flat washers and spring washers are
installed properly.
The cabinet is clean.
The cabinet is clear and complies with dustproof
requirements.
The paint on the cabinet exterior is intact. If paint flakes
off, repaint that area to avoid corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
There is no adhesive tape, cable tie, paper scrap, or
packing material around the cabinet.
The cabinet filler panels are in proper positions so that
the cold aisle and hot aisle are isolated.
Check Item
All aisle containment components are installed.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installation Verification

C Installation Verification

Check Result
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
Check Result
□ Compliant □
237

Advertisement

Table of Contents
loading

Table of Contents