Figure A-38 Routing half-sized PDU2000 cables
Step 3 Remove the rodent-proof mesh from the top of the cabinet, use diagonal pliers to cut openings
that allow cables to run through, and take out the PDU2000 cables through the openings, as
shown by (1), (2), and (3) in
Figure A-39 Taking out PDU2000 cables