Optional) Installing A Vcn500 - Huawei FusionModule5000 Series Installation Manual

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Step 4 Connect the server power cables to the PDU2000.
Figure 9-5 Connecting power cables for the server
----End

9.3 (Optional) Installing a VCN500

Procedure
Step 1 Determine the mounting holes for the VCN500 based on the network cabinet device layout,
adjust the guide rails, and install floating nuts.
Step 2 Place the VCN500 into the network cabinet with caution, and gently press down buttons on
the mounting ears, as shown in
Issue 01 (2019-03-05)
The server uses dual power supplies. Connect the two power cables to different PDU2000s.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
9-6.
9 Installing Monitoring Devices
115

Advertisement

Table of Contents
loading

Table of Contents