Huawei FusionModule5000 Series Installation Manual page 159

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 9-54 Routing the access monitoring cable (a pad is configured)
(1) Access monitoring cable
Figure 9-55 Routing the access monitoring cable (no pad is configured)
Step 5 Tighten two M3 captive screws to secure the baffle plate to the hanging kit, as shown in
Figure
Issue 01 (2019-03-05)
9-56.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing Monitoring Devices
(2) Pad power adapter cable