Figure 6-29 Cabinet labels
Step 2 Attach a label to the dented imprint on the skylight connective plate.
If there is no dented imprint on the skylight connective plate, attach a label at the accurate position
shown in
Figure 6-30 Position for attaching a label
Ensure that labels are properly aligned.