FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure A-4 Preparing a Cord End Terminal
(A) Cord end terminal connector
Preparing an RS485 Monitoring Cable
Figure A-5
Issue 01 (2019-03-05)
shows how to prepare a monitoring cable for the ECC collector.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(B) Insulation layer
A Appendix
(C) Copper core wire
202