Documents - Huawei FusionModule5000 Series Installation Manual

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 1-6 Smart module layout requirement

1.6 Documents

Before installation, prepare the following documents in addition to this document.
Table 1-3 Documents for hardware installation
Documentation
Onsite engineering layout
drawing
Quick Reference Guide to
the Smart Modular Data
Center
UPS5000-E-(40 kVA–128
kVA) Quick Guide
(Integrated UPS 2.0)
PDU8000 Modular
Precision PDC Quick Guide
Issue 01 (2019-03-05)
Purpose
Describes the cabinet
layout.
Smart Module Quick
Installation Guide
describes the unpacking
sequence, installation
procedure, and
installation precautions.
Smart Module
Management System
Wiring Diagram
describes how to route
cables for the
management system.
Describes the installation,
cable connection, and
power-on operations for the
integrated UPS.
Describes the installation,
cable connection, and
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Installation Preparations
Obtaining Method
(Remarks)
Provided by the engineering
designer or technical support
engineer.
The document is delivered
with the device, or you can
click Download.
The document is delivered
with the device, or you can
click Download.
The document is delivered
with the device, or you can
8

Advertisement

Table of Contents
loading

Table of Contents