Figure A-33 Connecting cables to the industrial connector (three-core cable)
Figure A-34 Connecting cables to the industrial connector (five-core cable)
A.7 (Optional) Connecting PDU2000 Cables
Context
If the PDU2000 is not provided with industrial connectors, connect the PDU2000 cables and
lay out the cables on the cabinet top. If new main ways are configured, connect cables to new
main ways, and then route the cables to the PDU2000s along cabinets.
Procedure
Step 1 Refer to
Figure A-35–Figure A-37
connections depend on the PDU2000 type and wiring port silk screen.
Issue 01 (2019-03-05)
Figure A-35–Figure A-37
show only the cable connection methods. PDU2000 cable
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
to connect the PDU2000 cables.