FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 4-7 Positioning combined bases
Step 7 Check that L1, L2, L3, and L4 meet the following requirements: |L1–L2| ≤ 5 mm and |L3–L4|
≤ 5 mm, as shown in
Figure 4-8 Base layout (unit: mm)
Step 8 Use a marker to mark the hole positions, as shown by (2) in
----End

4.1.1.3.3 Securing Bases

Prerequisites
The positions for installing bases have been determined.
Issue 01 (2019-03-05)
Figure
4-8.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Figure
4-7.
26