Figure 4-7 Positioning combined bases
Step 7 Check that L1, L2, L3, and L4 meet the following requirements: |L1–L2| ≤ 5 mm and |L3–L4|
≤ 5 mm, as shown in
Figure 4-8 Base layout (unit: mm)
Step 8 Use a marker to mark the hole positions, as shown by (2) in
----End