Figure 9-28 Installing the WiFi converter onto the guide rail
(1) Guide rail
Step 3 Install stop blocks. Install two stop blocks on the two sides of the WiFi converter to stop the
movement of the converter, as shown in
Figure 9-29 Installing stop blocks
Step 4 Install other actuators. Install other actuators in place in a similar way and secure them using
stop blocks.
Step 5 The WiFi antenna can be installed using the magnet on its base. Attach one WiFi antenna to
the upper frame mounting kit in the aisle containment and another WiFi antenna to the door
box on the right side (facing the aisle). Then connect the WiFi antennas to the RF_1 and RF_2
ports on the WiFi converter, as shown in
Issue 01 (2019-03-05)
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing Monitoring Devices
9-29.
Figure
9-30.
130

Advertisement

Table of Contents
loading

Table of Contents