Huawei FusionModule800 Installation Manual
Huawei FusionModule800 Installation Manual

Huawei FusionModule800 Installation Manual

Smart small data center six fans
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

Quick Links

FusionModule800 Smart Small Data Center
V100R001
Installation Guide (Six Fans)
Issue
10
Date
2019-12-20
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule800

  • Page 1 FusionModule800 Smart Small Data Center V100R001 Installation Guide (Six Fans) Issue Date 2019-12-20 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document Purpose This document describes the FusionModule800 Smart Small Data Center (smart module for short) in terms of the hardware installation, cable routes, installation inspection, and power-on commissioning, which helps you understand the installation and commissioning for the smart module in a systematic way.
  • Page 4 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) About This Document Symbol Description Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. Change History Changes between document issues are cumulative.
  • Page 5 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) About This Document Issue 03 (2017-04-25) This issue is the third official release.  Optimized indoor units and added the NetCol500-A020 outdoor unit.  Optimized the method for installing T/H sensors (in hot aisle containments).
  • Page 6: Table Of Contents

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) Contents Contents About This Document ........................ii 1 Safety Information ........................1 1.1 General Safety ................................1 1.2 Personnel Requirements ............................... 4 1.3 Electrical Safety ................................4 1.4 Installation Environment Requirements ........................6 1.5 Mechanical Safety ................................
  • Page 7 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) Contents 3.7.4 Installing an Outdoor Unit ............................67 3.7.4.1 Installation Requirements ............................. 67 3.7.4.2 Space Requirements .............................. 68 3.7.4.3 Securing an Outdoor Unit ............................. 71 3.7.5 Exhausting Nitrogen from the Indoor Unit ......................72 3.7.6 Connecting Refrigerant Pipes ..........................
  • Page 8 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) Contents 4 Cable Routing ..........................192 4.1 System Cabling Rules ............................... 192 4.2 Cable Routes ................................197 4.3 Power Cable Routing ..............................204 4.4 Smart Module Grounding ............................204 4.5 Cable Connections to the Power Supply and Distribution System ................206 4.5.1 Top Cable Routing ..............................
  • Page 9 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) Contents 6.3.7 Setting iBOX and iBAT Parameters........................248 6.3.8 Networking iBOXs and iBATs in Wireless Mode ....................249 6.3.9 Setting Alarm Notification by Email and SMS ...................... 250 6.3.10 Commissioning Cameras and a VCN (Smart ETH Gateway Networking Scenario) ........... 254 6.3.10.1 Commissioning IPC6325 Cameras ........................
  • Page 10: Safety Information

    The "NOTICE", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
  • Page 11 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information  Before installing, operating, or maintaining the equipment, remove any conductive objects such as watches or metal jewelry like bracelets, bangles, and rings to avoid electric shock. ...
  • Page 12 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information  All cable holes should be sealed. Seal the used cable holes with firestop putty. Seal the unused cable holes with the caps delivered with the cabinet. The following figure shows the criteria for correct sealing with firestop putty.
  • Page 13: Personnel Requirements

    Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements  Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
  • Page 14 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information Do not connect or disconnect power cables with power on. Transient contact between the core of the power cable and the conductor will generate electric arcs or sparks, which may cause fire or personal injury.
  • Page 15: Installation Environment Requirements

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information  Wear ESD gloves or a well-grounded ESD wrist strap when touching the device or handling boards or application-specific integrated circuits (ASICs).  When holding a board, hold its edge without touching any components. Do not touch the components with your bare hands.
  • Page 16: Mechanical Safety

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information Installation at Heights  Working at heights refers to operations that are performed at least 2 meters above the ground.  Do not work at heights if the steel pipes are wet or other potential danger exists. After the preceding conditions no longer exist, the safety director and relevant technical personnel need to check the involved equipment.
  • Page 17 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information  Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. Using Ladders  Use wooden or fiberglass ladders when you need to perform live working at heights.
  • Page 18 Metal shavings from drilling may short-circuit boards inside the equipment.  Obtain the consent from the customer, subcontractor, and Huawei before drilling.  Wear goggles and protective gloves when drilling holes. ...
  • Page 19: Cooling System Safety

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information 1.6 Cooling System Safety Welding  At least two persons are required on a welding site.  A welder must have a work permit.  A welding site must be free from inflammables.
  • Page 20: Battery Safety

    The site must be equipped with qualified fire extinguishing facilities, such as firefighting sands and powder fire extinguishers. To ensure battery safety and battery management accuracy, use batteries provided with the UPS by Huawei. Huawei is not responsible for any battery faults caused by batteries not provided by Huawei. Battery Installation Before installing batteries, observe the following safety precautions: ...
  • Page 21 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information  Note the polarities when installing batteries. Do not short-circuit the positive and negative poles of the same battery or battery string. Otherwise, the battery may be short-circuited.
  • Page 22: Others

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 1 Safety Information Lithium Battery The safety precautions for lithium batteries are similar to those for lead-acid batteries except that you also need to note the precautions described in this section.
  • Page 23: Installation Preparations

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Installation Preparations 2.1 Tools and Instruments Prepare the tools and meters required for installation. Table 2-1 General tools and instruments Name, Specifications, and Appearance Protective gloves Marker Measuring tape (5 m)
  • Page 24 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Name, Specifications, and Appearance Needle-nose pliers Diagonal pliers RJ11 crimping tool Polyvinyl chloride (PVC) insulation tape Wire stripper Hydraulic pliers Wire clippers Crimping tool Multimeter Electroprobe Heat shrink tubing...
  • Page 25 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Name, Specifications, and Appearance Antifreeze gloves Cutter Welding torch 5% silver solder Oxygen Acetylene Hot melt device Clamp meter Pipe bender Insulation gloves Pressure gauge (1 Leather hose (3...
  • Page 26: Checking The Installation Environment

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Name, Specifications, and Appearance temperatures higher than 85° C and the following requirements are met:  Applicable to all pipe materials  Anaerobic metal pipe thread sealant with PTEF as the padding ...
  • Page 27 If any of the requirements is not met, contact Huawei technical support. The UPS can generate large leakage currents. A circuit breaker equipped with an RCD is not recommended. If leakage protection is required, select a recommended upstream circuit breaker for the smart module.
  • Page 28 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Load Recom Three Term Resid mende Cooling Smart Cooling Cooling Smart Smart inal d Cable Only Cooling Only Only Cooling Cooling Speci Curre Smart Product Smart Smart Products...
  • Page 29: Site Requirements

    The cabinet layouts shown in the figures are for ease of description and do not provide reference for engineering layout.  If the site conditions do not meet the space requirements, contact Huawei technical support. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 30: Installation Scenarios

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations  The Smart Module can be installed with one side against a wall. Figure 2-1 Space requirements for a cold-aisle containment Table 2-6 Cabinet information Reference Net Cabinet Type...
  • Page 31 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Figure 2-2 Component layout (1) Binding plate (2) Cabinet sealing plate (3) IT cabinet (4) Converged Cabinet (5) Battery cabinet (6) PAD (7) Camera The IT cabinet to the left of the Converged Cabinet houses various components depending on the configurations.
  • Page 32 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations Figure 2-3 Component layout in the IT cabinet to the left of the Converged Cabinet You are advised to number cabinets and PDU2000s based on Figure 2-4. ...
  • Page 33: Smart Cooling Product Installation

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 2 Installation Preparations 2.5 Smart Cooling Product Installation Installation Dimensions Smart cooling product outdoor units are available in two models, NetCol500-A018 and NetCol500-A020. Figure 2-5 Figure 2-6 show the dimensions of NetCol500-A018 and NetCol500-A020.
  • Page 34: Personnel Requirements

    Only trained and qualified personnel who fully understand basic safety precautions are allowed to install and operate a modular data center. Huawei will not be liable for any consequence caused by the violation of this document. The requirements are as follows: ...
  • Page 35: Hardware Installation

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Hardware Installation 3.1 Transportation and Unpacking 3.1.1 Cabinet Transportation and Unpacking Context  Only trained personnel are allowed to move the cabinet. Remove the packed cabinet from the pallet using a pallet truck and move the cabinet to the installation position.
  • Page 36 Check against the packing list that the equipment and fittings are correct and complete. If some fittings are missing or do not comply with the packing list, record the information and contact your local Huawei office immediately. After checking that the cabinet is intact, remove the screw assemblies that secure the...
  • Page 37 Check against the packing list that the equipment and fittings are correct and complete. If some fittings are missing or do not comply with the packing list, record the information and contact your local Huawei office immediately. After checking that the Converged Cabinet is intact, remove the L-shaped brackets that secure the cabinet to the pallet.
  • Page 38 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-3 Removing the L-shaped brackets Figure 3-4 Installing the cabinet lower sealing plates The middle two screws in the cabinet rear are used to secure the latch.
  • Page 39: Smart Cooling Product Transportation And Unpacking

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-5 Installing ramps Raise the six leveling feet to the highest point using an adjustable wrench, and push the cabinet to the installation position over castors. ----End 3.1.2 Smart Cooling Product Transportation and Unpacking...
  • Page 40 If yes, replace the safety valve. If no, install the outdoor unit. For position of safety valve, see the overtemperature mark.  If the marks with 60 and 65 turn black or all the marks turn black, ask Huawei to confirm whether the unit can be used. ----End Unpacking the Outdoor Unit Step 1 Verify that the outdoor unit package is intact.
  • Page 41 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-7 Removing an outdoor unit Step 5 If necessary, hoist the outdoor unit according to Figure 3-8 Figure 3-9 onsite. Figure 3-8 Hoisting a NetCol500-A018 outdoor unit Issue 10 (2019-12-20) Copyright ©...
  • Page 42: Optional) Removing Aisle Containments

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-9 Hoisting a NetCol500-A020 outdoor unit ----End 3.2 (Optional) Removing Aisle Containments Prerequisites The cabinets have been transported to the destination and unpacked. Context If the site elevator is too small to transport a cabinet, remove the aisle containment from the cabinet.
  • Page 43 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Record the PAD cable route because you need to bind the PAD cable along the original route in subsequent installation. Figure 3-10 Removing the PAD cable Step 3 Lift the cabinet door until it is separate from the hinge, and remove the front door, as shown Figure 3-11.
  • Page 44 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  The cabinet front door is heavy. Arrange at least two persons to carry the door.  Before removing the cabinet door, disconnect the ground cable between the cabinet door and the cabinet.
  • Page 45 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-12 Removing an air director Step 5 Remove the fan assembly from the top of the aisle containment, as shown in Figure 3-13. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 46 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  A step ladder is required in this step.  If no fan assembly is configured, remove the upper sealing plate from the aisle containment in the same manner.
  • Page 47 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-14 Removing a bottom sealing plate Step 7 Unscrew the aisle containment from the cabinet using a Phillips screwdriver, as shown in Figure 3-15. Issue 10 (2019-12-20)
  • Page 48 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-15 Removing an aisle containment Step 8 Remove other aisle containments in the same way. Step 9 Transport the removed air director, glass door, fan assembly, and aisle containment to the installation position together with the cabinet using an elevator.
  • Page 49: Adjusting The Positions Of Aisle Side Sealing Plates

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-16 Positioning bolt on an air director (1) Positioning bolt ----End 3.3 Adjusting the Positions of Aisle Side Sealing Plates Context  The Converged Cabinet has been configured with aisle side sealing plates on both sides before delivery.
  • Page 50 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Set the removed materials aside for they will be used in subsequent installation steps. Figure 3-17 Removing an aisle side sealing plate from the Converged Cabinet Step 2 Remove the other aisle side sealing plate in the same way.
  • Page 51 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  Align the sealing plate fasteners with those in front of the appropriate sealing frame.  Obtain the sealing plate fasteners from the Converged Cabinet fitting bag. Figure 3-18 Installing sealing plate fasteners on an end cabinet...
  • Page 52: Adjusting The Positions Of Cabinet Side Panels

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-19 Installing an aisle side sealing plate on an end cabinet Step 5 Install an aisle side sealing plate on the other end cabinet in the same manner.
  • Page 53 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Procedure Step 1 Remove the side panel from the IT cabinet, as shown in Figure 3-20. Set the removed materials aside for they will be used in subsequent installation steps.
  • Page 54: Adjusting The Positions Of Battery Cabinet Side Panels

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation 3.4.2 Adjusting the Positions of Battery Cabinet Side Panels If an auxiliary battery cabinet (without circuit breakers) is deployed in the Smart Module, remove the panel on one side of the main battery cabinet and install the side panel on the outer side of the auxiliary cabinet.
  • Page 55 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  Use a measuring tape to check that the vertical distance between the top of the 2000 mm high cabinet and the floor is 2000 mm (+3 mm). Then use a level to check that the cabinet is level.
  • Page 56: Installing A Fan Assembly

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Level the cabinet adjacent to the end cabinet using the method in Step Remove the screws securing connecting kits from the cabinet, take off the connecting kits, and properly store the removed screws, as shown by (1) in Figure 3-22.
  • Page 57 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Procedure Step 1 Remove the baffle plate from the top of the aisle containment. Step 2 Install the fan assembly. Figure 3-23 Installing a fan assembly Step 3 Remove the cover from the XT7 terminal block at the rear door of the Converged Cabinet.
  • Page 58 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-24 Removing the cover from the XT7 terminal block Step 4 Connect the fan assemblies in series using the delivered cables. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 59 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-25 Connecting cables to the emergency fan assemblies (1) Power cable (BOM number: 04092766; SN label on the packing bag: 8) (2) Cascading cable (BOM number: 04080394; SN label on the packing bag: 11)
  • Page 60: Installing A Smart Cooling Product

    30 m, no R410A refrigerant needs to be purchased. If the length is greater than 30 m and less than or equal to 60 m, R410A refrigerant needs to be purchased. Do not use unqualified refrigerant. Huawei will not be liable for any equipment damage caused by unqualified refrigerant.
  • Page 61 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Saturation Gauge Saturation Gauge Saturation Gauge Temperature Pressure Temperature Pressure Temperature Pressure (° C) (MPa) (° C) (MPa) (° C) (MPa) 1.31 2.21 0.73 1.35 2.27 0.75 1.39 2.33...
  • Page 62 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-27 Oil trap (unit: mm) Gas Pipe, Liquid Pipe, and Thermal Insulation Foam (Optional) Table 3-2 lists the specifications for pipes and thermal insulation foam. Table 3-2 Specifications...
  • Page 63 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-28 Connecting a drainpipe (1) Drainpipe connector: BSPT (2) Rigid pipe conversion adapter: (3) Rigid pipe: 1/2-inch, delivered with the BSPP 1/2 inch, connected to a made of PP-R or...
  • Page 64 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-29 Connecting a water inlet pipe (1) Connector with inner screw (2) Rigid pipe conversion adapter: (3) Rigid pipe: thread: G 1/2 inch, delivered G 1/2 inch, connected to a rigid...
  • Page 65 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-30 Pipe support (unit: mm)  The height of a U-shaped pipe clamp equals the pipe diameter with thermal insulation foam minus 5 mm. The pipe supports are to be purchased by the customer.
  • Page 66: Installation Layout

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Application Specifications Remarks Scenario (optional) Naked crimping terminal, single-wire cord Delivered with the end terminal, 1.5 mm , 7.5 A, tin plating, fittings insertion depth 12 mm, black Naked crimping terminal: OT, 1.5 mm...
  • Page 67 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  The height deviation refers to the distance from the stop valves of the indoor unit to the stop valves of the outdoor unit.  is a sign of a tilt, and it indicates that the scale of the pipe tilting is 1:200. The pipe tilting direction should be consistent with the hypotenuse of the right triangle.
  • Page 68: Optional) Installing An Indoor Unit

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-32 Layout of downward piping (1) Oil trap (2) Tilted gas pipe (3) Indoor unit (4) Tilted liquid pipe 3.7.3 (Optional) Installing an Indoor Unit Context This section describes how to install the third smart cooling product in the IT cabinet (to the left of the Converged Cabinet).
  • Page 69 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  Arrange at least two persons to move the mounting bars.  Exercise caution when moving mounting bars to avoid deforming the cabinet bottom panel. Remove the baffle plate secured to the top of the mounting bars on the front door side, as...
  • Page 70 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-34 Removing guide rails Remove screws from the mounting bar and move the entire mounting bar 50 mm towards the cabinet exterior, as shown in Figure 3-35.
  • Page 71 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-35 Removing screws from a mounting bar (unit: mm) Step 2 Install two smart cooling product guide rails respectively at the bottom of both sides of the...
  • Page 72 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-36 Installing guide rails Step 3 Engage floating nuts into appropriate positions on the cabinet column using a floating nut mounting bar or a flat-head screwdriver, as shown in Figure 3-37.
  • Page 73 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-38 Installing floating nuts Step 4 Take air director guide rails from the smart cooling product fitting bag and secure the guide rails using five M5x10 screws, as shown in Figure 3-39.
  • Page 74 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-40 Installing an indoor unit Step 6 Push the smart cooling product control unit to the 11 U position in the cabinet and secure the cabinet using four M6x12 screws, as shown in Figure 3-41.
  • Page 75 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  When there are more than six cabinets in the cold aisle and the indoor unit is installed inside the cabinet, install an air director in front of the indoor unit.
  • Page 76: Installing An Outdoor Unit

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-43 Installing an air director ----End 3.7.4 Installing an Outdoor Unit 3.7.4.1 Installation Requirements Precautions  An outdoor unit must be installed by professionals. Incorrect installation will cause fire, electric shocks, damage, and water leaks.
  • Page 77: Space Requirements

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  Try to install an outdoor unit against a wall. If the site conditions cannot meet the requirements and the local outdoor temperature may be below –10° C (NetCol500-A018) or 0°...
  • Page 78 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-45 Space requirements for installing single outdoor unit If the outdoor unit cannot be installed against a wall or the local outdoor temperature may be below –10° C (NetCol500-A018) or 0° C (NetCol500-A020), place an air baffle at...
  • Page 79 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-47 Requirements for installing an outdoor unit on a wall  The bearing capacity of the support platform is more than 230 kg.  Reserve no less than 300 mm from the left or right side of the outdoor unit for maintenance personnel to walk.
  • Page 80: Securing An Outdoor Unit

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation 3.7.4.3 Securing an Outdoor Unit Prerequisites  The M10 expansion bolts used for securing an outdoor unit have been prepared.  The concrete groundwork is prepared. Context ...
  • Page 81: Exhausting Nitrogen From The Indoor Unit

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-49 Installing an outdoor unit ----End 3.7.5 Exhausting Nitrogen from the Indoor Unit Context Nitrogen is exhausted from the indoor unit through both the gas pipe needle valve and liquid pipe needle valve of the indoor unit stop valve.
  • Page 82 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-50 Stop valve (1) Needle valve nut (2) Rear cover nut (3) Black plastic nut Procedure Step 1 Open the stop valves on the gas pipe and liquid pipe of the indoor unit in turn using a 5 mm hex key.
  • Page 83: Connecting Refrigerant Pipes

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation There should be a great sound of airflow during the exhausting. Figure 3-52 Exhausting nitrogen from an indoor unit (1) Pressure gauge (2) Gas pipe needle valve (3) Liquid pipe needle valve When exhausting nitrogen, do not remove the valve plug in case of losing it.
  • Page 84 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-53 Pipe assembly (1) Liquid pipe (2) Gas pipe (3) Sheet metal  Figure 3-53 describes how to route pipes inside a cabinet for the scenario with double smart cooling products with top pipe routing.
  • Page 85 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-54 Top pipe routing inside the Converged Cabinet  (Optional for installing a third smart cooling product) Laying out pipes inside the IT cabinet Remove the six cable rings from the side-routed pipe in the rear of the IT cabinet, as...
  • Page 86 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-55 Removing cable rings Take the binding plate from the pipe fitting bag, and secure it to the rear of the IT cabinet using the screws removed in the previous step, as shown in Figure 3-56.
  • Page 87 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-56 Installing a binding plate Lay out pipes inside the IT cabinet, as shown in Figure 3-57. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 88 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-57 Top pipe routing inside the IT cabinet Bottom Pipe Routing  Laying out pipes inside the Converged Cabinet Figure 3-58 shows the pipe layout. Issue 10 (2019-12-20)
  • Page 89 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-58 Bottom pipe routing inside the Converged Cabinet  (Optional for installing a third smart cooling product) Laying out pipes inside the IT cabinet Figure 3-59 shows the pipe layout.
  • Page 90: Laying Out Pipes Outside A Cabinet

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-59 Bottom pipe routing inside the IT cabinet 3.7.6.2 Laying Out Pipes Outside a Cabinet Prerequisites Check that the nuts on the needle valve and rear cover of the smart cooling product are tightened.
  • Page 91 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  When connecting the indoor and outdoor units, seal the pipe after the welding break exceeds 15 minutes to prevent dust and water from entering the pipe. ...
  • Page 92 Check that the PTFE washer on the stop valve and the inner protruding surface of the active connector nut are free of impurities and scratches. Clean up impurities using alcohol or a wet cloth. For any scratch, contact Huawei technical support for replacement.
  • Page 93 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Tighten the liquid pipe stop valve using a 27# torque wrench to a torque of 35-37 N•m.  Tighten the gas pipe stop valve using a 36# torque wrench to a torque of 50-52 N•m.
  • Page 94: Connecting Water Pipes

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Step 4 Take out the outdoor unit stop valve pipe from the outdoor unit fitting bag and connect the pipe by referring to Step 3.1, Step 3.2, and Step 3.3.
  • Page 95: Optional) Connecting The Humidifier Water Inlet Pipe

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-64 Holes in the smart cooling product (1) Water inlet hole (2) Strong-current cable hole (3) Water outlet hole (4) Signal cable hole (5) Gas pipe stop valve (6) Liquid pipe stop valve 3.7.7.1 (Optional) Connecting the Humidifier Water Inlet Pipe...
  • Page 96 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation thread: G 1/2 inch, delivered G 1/2 inch, connected to a rigid made of PP-R or with the water inlet pipe pipe with outer screw threads other material...
  • Page 97 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation The other end is a reserved G 1/2 inch connector with inner screw threads. Connect the other end to a hose or rigid pipe based on site requirements.
  • Page 98 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-68 Removing the baffle plate from the bottom of the cabinet Figure 3-69 Bottom routing of the water inlet pipe Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 99: Connecting The Condensate Drainpipe

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation After routing water pipes, secure them to the pipe assembly using cable ties, and seal the cable hole using firestop putty. ----End 3.7.7.2 Connecting the Condensate Drainpipe Context The smart cooling product condensate drainpipe inside the cabinet can be routed from top or bottom.
  • Page 100 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation The object shown in the broken line box is the drainpipe connector with outer screw threads delivered with smart cooling products. The hose clamp (part 5) is used in standard configuration. Other parts are not configured and need to be purchased onsite.
  • Page 101 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  An arrow on the check valve body indicates the flow direction. Ensure that the water flow direction is consistent with the direction of the arrow when the drainpipe connects to the check valve.
  • Page 102 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-73 Connecting a drainpipe Step 2 Route the bottom drainpipe.  The smart cooling product fitting bag contains drainpipe connectors. Choose hoses or rigid pipes based on site requirements.
  • Page 103 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-74 Removing the baffle plate from the bottom of the cabinet Figure 3-75 Bottom drainpipe routing Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 104: Leakage Test With Nitrogen

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation After routing water pipes, secure them to the pipe assembly using cable ties, and seal the cable hole using firestop putty. ----End 3.7.8 Leakage Test with Nitrogen Context ...
  • Page 105: Connecting Cables

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-76 Leakage test with nitrogen (1) Reducing valve (2) Nitrogen cylinder (3) Low pressure gauge (4) High pressure gauge (5) Gas pipe needle valve (6) Liquid pipe needle valve Step 3 Inject 3.0 MPa nitrogen and preserve the pressure for 24 hours.
  • Page 106 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-77 Front panel of the smart cooling product control unit (1) Ground point (2) Rectifier (3) PSU (4) FE_2 port for connecting (5) FE_1 port for connecting...
  • Page 107 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-79 Electrical ports on the indoor unit (1) Electric heater (2) Wiring terminals for customer (X2.1, X2.2, and X2.3 contactor (required if an connect to P, Q, and E on the outdoor unit. X2.4 and X2.5 are electric heater is reserved to connect to the port for reporting common alarms.
  • Page 108 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  For the third smart cooling product, connect all the cables shown in Figure 3-80 except cable 1 onsite. For the scenario with single smart cooling product or double smart cooling products, connect cables 3, 4, and 10 only.
  • Page 109 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Applicable Cable From Cable Remarks Scenario Name Specifications the IT cabinet to the PDC in the converged cabinet along the smart cooling product pipes. Smart Converged INPUT1 port on 2 x 1.5 mm...
  • Page 110 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Applicable Cable From Cable Remarks Scenario Name Specifications power cable J3 cable X101, J3 port on the Connected onsite X102, and smart cooling X103 ports product control on the...
  • Page 111: Vacuumization

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Applicable Cable From Cable Remarks Scenario Name Specifications Outdoor L, N, and 3 x 6 mm Connected onsite unit power (converged ground ports on cable cabinet the electric...
  • Page 112 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Procedure Step 1 Connect the pressure gauge and vacuum pump and check that the pressure gauge valves are all open. Figure 3-81 Vacuumization (1) Vacuum (2) Pressure (3) Gas pipe needle...
  • Page 113: Installing Batteries

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation If the pressure gauge cannot display 60 Pa (absolute pressure), perform vacuum pumping so that the pressure gauge stays at the smallest scale and preserve the pressure for 1 hour. Then, check whether the pressure displayed on the gauge has an obvious increase.
  • Page 114 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Battery Cabinet Overview The battery appearance and layout shown in the figure are for reference only. The actual battery appearance and battery wiring diagram prevail. Figure 3-83 Battery cabinet...
  • Page 115 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-84 Directly connecting two batteries  When the length of a battery cable is longer than the distance between two battery terminals, connect the cable in the way shown in Figure 3-85.
  • Page 116 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-86 Incorrect battery cable connection method Precautions for Connecting Battery Cables  For details about how to connect battery cables, see the battery cable connection diagram delivered with the cables.
  • Page 117 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-87 Installing a separator  Route and secure cables between layers along the rack rail in the vertical direction, as shown by (1) in Figure 3-88. ...
  • Page 118 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation shown by (2) in Figure 3-91. Connect cables to the battery, as shown by (3) in Figure 3-91. Figure 3-89 Removing the circuit breaker panel Figure 3-90 Connecting strong-current power cables to circuit breakers (1) Issue 10 (2019-12-20) Copyright ©...
  • Page 119 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-91 Connecting strong-current power cables to circuit breakers (2) Connecting Cables to the MCBs in a Battery Cabinet Before connecting cables, ensure that the miniature circuit breakers (MCBs) are OFF.
  • Page 120 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-92 Removing the MCB panel Figure 3-93 Connecting strong-current power cables to MCBs (1) Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 121 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-94 Connecting strong-current power cables to MCBs (2) Installing Panels Reinstall the circuit breaker panel. Secure filler panels to the rack rails on the rear door, as shown in Figure 3-95.
  • Page 122: Installing A Battery Pack

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation 3.9 Installing a Battery Pack Context The battery pack is installed at the bottom of the IT cabinet adjacent to the Converged Cabinet.  If no smart cooling product is installed in the IT cabinet, install battery packs from bottom to top starting from the 1 U position above the cabinet bottom.
  • Page 123: Optional) Installing Cable Troughs

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-97 Installing heavy guide rails Step 4 Push the battery back onto the guide rails, and secure the battery pack to the cabinet rack rails using mounting ears and screws, as shown in Figure 3-98.
  • Page 124: Removing A Binding Plate

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation 3.10.1 Removing a Binding Plate Prerequisites A cable trough is determined to be installed. Context Install a binding plate at the top of the cabinet, as shown in Figure 3-99.
  • Page 125: Installing A 600 Mm Wide Cable Trough

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-100 Removing a binding plate Step 2 Remove other binding plates in the same way. ----End 3.10.2 Installing a 600 mm Wide Cable Trough Context Install two 600 mm wide cable troughs on the top of every 600 mm wide cabinet. When installing cable troughs, first install two cable troughs at the top of the end cabinet, and then install the other cable troughs at the top of other cabinets along the aisle in sequence.
  • Page 126 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-101 600 mm wide cable trough (1) Partition plate (2) Side panel (3) Supporting plate When installing cable troughs, be aware of PDU2000 cables at the top of the cabinet: ...
  • Page 127 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-102 Clamping a vertical plate Step 2 Rotate the vertical plate by 90 degrees to stand it on the top plate of the cabinet, as shown in Figure 3-103.
  • Page 128 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-104 Installing the other vertical plate Step 4 Press a supporting plate along the two vertical plates down to the place between the four clasps and the cable bridge, as shown in Figure 3-105.
  • Page 129 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation as shown in Figure 3-106. (By default, insert the clasps into the two adjacent square holes in the middle. In actual conditions, determine the square holes as required.) Figure 3-106 Installing a partition plate Step 6 Install adjacent cable troughs in the same way.
  • Page 130: Installing An 800 Mm Wide Cable Trough

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Step 8 Install the cable trough above the rear door in a similar way. ----End 3.10.3 Installing an 800 mm Wide Cable Trough An 800 mm wide cable trough (BOM number: 21501140) is installed on the top of an 800 mm wide cabinet.
  • Page 131: Installing A Pad

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-109 Installing a SIM card Step 3 Reconnect the signal cable to the panel of the ECC800 main control module based on the recorded position. Step 4 Install the antenna.
  • Page 132 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Context The PAD is installed on the door of the Converged Cabinet, as shown in Figure 3-111. Figure 3-111 PAD installation position (1) PAD installation position Procedure Step 1 Adjust the width and height of the PAD support to match the dimensions of the PAD to be installed.
  • Page 133 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-112 Adjustment screws (1) Adjustment screws Step 2 Remove nuts from the PAD support, insert the support into the mounting holes on the cabinet front door, and reinstall the nuts to secure the support to the front door.
  • Page 134 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Ensure that the PAD is installed securely and reliably. Figure 3-114 Installing a PAD Step 5 Connect the PAD charge cable. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 135: Optional) Installing A Vcn500

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  The PAD charge cable has been routed near the charge port on the rear door of the Converged Cabinet.  To connect the PAD charge cable, connect the charge conversion adapter obtained from the PAD package to the charge port, and then connect the PAD charge cable to the charge conversion adapter.
  • Page 136 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-116 VCN500 installation position Procedure Step 1 Select VCN500 mounting holes on the IT cabinet, adjust the guide rails or trays, and install floating nuts. Step 2 Place the VCN500 with caution into the IT cabinet, and gently press down buttons on the left...
  • Page 137: Installing The Vcn540

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-118 Installing a VCN500 Step 4 Connect the VCN500 power cable to the appropriate PDU2000. ----End 3.11.4 Installing the VCN540 Context  The VCN540 does not carry disks when being delivered. First install disks and then install the device in a network cabinet.
  • Page 138 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-119 Installing a hard drive Step 2 Determine the mounting holes for the VCN540 in the network cabinet based on the engineering layout diagram, adjust the guide rails and install floating nuts.
  • Page 139 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-121 Installing mounting ears Step 4 Place the VCN540 on the guide rails. Keep pushing the subrack until the mounting ears of the subrack are close to the mounting bar at the front of the network cabinet.
  • Page 140: Optional) Installing A Lan Switch

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-123 Securing a VCN540 ----End 3.11.5 (Optional) Installing a LAN Switch Context The LAN switch needs to be installed in the 38 U position on the top of the IT cabinet front...
  • Page 141 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-124 Position for the LAN switch Procedure Step 1 Locate the LAN switch installation position in the IT cabinet, and install guide rails and floating nuts. Step 2 Install the mounting ears delivered with the LAN switch, and secure the LAN switch to the rack rails in the front of the cabinet.
  • Page 142: Installing T/H Sensors (In Cold Aisle Containments)

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-125 Installing a LAN switch Step 3 Connect the LAN switch power cable to the PDU2000. Step 4 Connect any port among the 1-24 ports of the LAN switch to the WAN_1 port on the ECC800 using a network cable.
  • Page 143 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  The number of T/H sensors depends on the number of smart cooling products and cabinets. Each smart cooling product should be configured with at least one T/H sensor.
  • Page 144 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-128 Installing a T/H sensor outside an aisle Step 2 Set DIP switches for the T/H sensors and connect communications cables to them. Figure 3-129 DIP switch on a T/H sensor Issue 10 (2019-12-20) Copyright ©...
  • Page 145 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-130 Address and DIP switch setting on a T/H sensor Description about the cable connection to and DIP switch setting on a T/H sensor:  Connect the T/H sensors in the shape of to smart cooling product control unit 1 in series.
  • Page 146 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-131 Connecting T/H Sensors in Series and Then to the Control Unit  T/H is short for temperature and humidity sensor. A/C is short for smart cooling product. Addr is short for DIP switch address.
  • Page 147 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-132 T/H sensor layout and DIP switch address (1 cabinet and 1 smart cooling product) Figure 3-133 T/H sensor layout and DIP switch address (2 cabinets and 1 smart cooling product) Issue 10 (2019-12-20) Copyright ©...
  • Page 148 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-134 T/H sensor layout and DIP switch address (3 cabinets and 1 smart cooling product) Figure 3-135 T/H sensor layout and DIP switch address (4 cabinets and 1 smart cooling product) Issue 10 (2019-12-20) Copyright ©...
  • Page 149 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-136 T/H sensor layout and DIP switch address (5 cabinets and 1 smart cooling product) Figure 3-137 T/H sensor layout and DIP switch address (6 cabinets and 1 smart cooling product) Issue 10 (2019-12-20) Copyright ©...
  • Page 150 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-138 T/H sensor layout and DIP switch address (7 cabinets and 1 smart cooling product) Figure 3-139 T/H sensor layout and DIP switch address (8 cabinets and 1 smart cooling product) Issue 10 (2019-12-20) Copyright ©...
  • Page 151 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-140 T/H sensor layout and DIP switch address (2 cabinets and 2 smart cooling products) Figure 3-141 T/H sensor layout and DIP switch address (3 cabinets and 2 smart cooling products) Issue 10 (2019-12-20) Copyright ©...
  • Page 152 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-142 T/H sensor layout and DIP switch address (4 cabinets and 2 smart cooling products) Figure 3-143 T/H sensor layout and DIP switch address (5 cabinets and 2 smart cooling products) Issue 10 (2019-12-20) Copyright ©...
  • Page 153 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-144 T/H sensor layout and DIP switch address (6 cabinets and 2 smart cooling products) Figure 3-145 T/H sensor layout and DIP switch address (7 cabinets and 2 smart cooling products)
  • Page 154 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-147 T/H sensor layout and DIP switch address (3 cabinets and 3 smart cooling products) Figure 3-148 T/H sensor layout and DIP switch address (4 cabinets and 3 smart cooling products) Issue 10 (2019-12-20) Copyright ©...
  • Page 155 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-149 T/H sensor layout and DIP switch address (5 cabinets and 3 smart cooling products) Figure 3-150 T/H sensor layout and DIP switch address (6 cabinets and 3 smart cooling products)
  • Page 156: Installing T/H Sensors (In Hot Aisle Containments)

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-152 T/H sensor layout and DIP switch address (8 cabinets and 3 smart cooling products) ----End 3.11.7 Installing T/H Sensors (in Hot Aisle Containments) This section describes how to install T/H sensors in hot aisle containments.
  • Page 157 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-153 Installing a T/H sensor (on a left post) Step 2 Set DIP switches for the T/H sensors and connect communications cables to them. Figure 3-154 DIP switch on a T/H sensor Issue 10 (2019-12-20) Copyright ©...
  • Page 158 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-155 Address and DIP switch setting on a T/H sensor Description about the cable connection to and DIP switch setting on a T/H sensor:  Connect the T/H sensors in the shape of to smart cooling product control unit 1 in series.
  • Page 159 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-156 Connecting T/H Sensors in Series and Then to the Control Unit  T/H is short for temperature and humidity sensor. A/C is short for smart cooling product. Addr is short for DIP switch address.
  • Page 160 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-158 T/H sensor layout and DIP switch address (1 smart cooling product for 2 cabinets) Figure 3-159 T/H sensor layout and DIP switch address (1 smart cooling product for 3 cabinets) Issue 10 (2019-12-20) Copyright ©...
  • Page 161 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-160 T/H sensor layout and DIP switch address (1 smart cooling product for 4 cabinets) Figure 3-161 T/H sensor layout and DIP switch address (1 smart cooling product for 5 cabinets) Issue 10 (2019-12-20) Copyright ©...
  • Page 162 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-162 T/H sensor layout and DIP switch address (1 smart cooling product for 6 cabinets) Figure 3-163 T/H sensor layout and DIP switch address (1 smart cooling product for 7 cabinets)
  • Page 163 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-165 T/H sensor layout and DIP switch address (2 smart cooling products for 2 cabinets) Figure 3-166 T/H sensor layout and DIP switch address (2 smart cooling products for 3 cabinets) Issue 10 (2019-12-20) Copyright ©...
  • Page 164 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-167 T/H sensor layout and DIP switch address (2 smart cooling products for 4 cabinets) Figure 3-168 T/H sensor layout and DIP switch address (2 smart cooling products for 5 cabinets)
  • Page 165 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-170 T/H sensor layout and DIP switch address (2 smart cooling products for 7 cabinets) Figure 3-171 T/H sensor layout and DIP switch address (2 smart cooling products for 8 cabinets)
  • Page 166 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-173 T/H sensor layout and DIP switch address (3 smart cooling products for 4 cabinets) Figure 3-174 T/H sensor layout and DIP switch address (3 smart cooling products for 5 cabinets)
  • Page 167: Installing A Camera

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-176 T/H sensor layout and DIP switch address (3 smart cooling products for 7 cabinets) Figure 3-177 T/H sensor layout and DIP switch address (3 smart cooling products for 8 cabinets) ----End 3.11.8 Installing a Camera...
  • Page 168 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation In the hot aisle containment, install the camera at the front right position in the aisle. Procedure Step 1 (Optional) Install an SD card. Loosen the screws on the front cover of the camera using a wrench, remove the front...
  • Page 169 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-180 Installing a Camera This camera model provides triple-axis adjustment design. Connect the auxiliary video cable delivered with the camera to a display device such as the monitor. Rotate the camera 0-355 degrees horizontally, 0-75 degrees vertically, or 0-355 degrees in the revolving direction to achieve an appropriate angle.
  • Page 170 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-182 Installing a camera mounting plate Step 4 Connect the camera monitoring cable. Connect one end of a network cable to the Ethernet port on the camera and the other end to any network port on the smart ETH gateway (with PoE power supply).
  • Page 171 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-183 Adjusting focal length (1) Lens adjustment pole Use a flat-head screwdriver to loosen the screw during first adjustment of focal length. Step 6 Before installing the inner cover, adjust the infrared light panel of the camera to keep the...
  • Page 172: Installing A Smart Eth Gateway

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-185 Installing a front cover ----End 3.11.9 Installing a Smart ETH Gateway If a smart ETH gateway is configured, perform the following steps to install it. Prerequisites ...
  • Page 173 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  If two smart ETH gateways are configured, install them in positions shown in Figure 3-186.  If three smart ETH gateways are configured, install two of them in positions shown in...
  • Page 174 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-187 Position 2 for installing a smart ETH gateway (1) Smart ETH gateway The methods for installing a smart ETH gateway on the two positions are similar. This section describes how to install a smart ETH gateway on the M-shaped cable trough.
  • Page 175: Installing An Ai/Di Module

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Press the lower part of the smart ETH gateway to clamp the smart ETH gateway onto the guide rail. Shake the smart ETH gateway in different directions to ensure that it is reliably installed.
  • Page 176: Connecting A Cable To The Wlds900 Water Sensor

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-191 Installing an AI/DI module Step 3 Set the address for the AI/DI module to 1. Figure 3-192 Setting an address ----End 3.11.11 Connecting a Cable to the WLDS900 Water Sensor Context ...
  • Page 177 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-193 Detector positions (1) Water detector Figure 3-194 Water sensor (1) Water detector (2) Conversion cable end A, (3) Conversion connected to the water detector cable Issue 10 (2019-12-20)
  • Page 178 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation (4) Conversion cable end B, (5) Water detection cable end A, (6) Water connected to the water detection connected to the conversion cable detection cable cable Figure 3-195 Laying out the water detection cable...
  • Page 179 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-196 Removing the cover from the water detector Install the water detector bottom plate in the Converged Cabinet using two M3 screws, as shown in Figure 3-197.
  • Page 180 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Reinstall the water detector cover by referring to Step Step 2 Figure 3-198 shows how to connect the water detection cable to the conversion cable. Figure 3-198 Connecting cables...
  • Page 181: Installing A Smoke Detector

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-200 Installing fasteners When laying out the water detection cable, ensure that the water detector is close to the Converged Cabinet to facilitate further cable connections. Step 7 Place the water detection cable onto the fastener, secure the fastener, and keep the water...
  • Page 182 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-202 Detector positions (1) Smoke detector The screws for installing the smoke detector are in the Converged Cabinet fitting bag. Procedure Step 1 Secure the smoke detector base to the mounting bracket at the top of the cabinet.
  • Page 183: Optional) Installing An In-Room Access Actuator

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation ----End 3.11.13 (Optional) Installing an In-Room Access Actuator Context  The BOM number of an access actuator is 52271874.  It is recommended that the access actuator be installed 0.5 m away from the door edge and 2.2 m above the floor at the inner side of a door.
  • Page 184 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Partially tighten the nuts clockwise until the expansion anchor bolts and expansion sleeves are secured to the wall. Loosen the nuts counterclockwise and remove the spring washers and flat washers.
  • Page 185 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-206 Securing a waterproof box Step 5 Take out the access actuator and clamp it along the guide rails. Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 186 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation  Before installing the access actuator, ensure that the clip spring on the back of the actuator is loose.  Verify that the access actuator indicator faces leftwards so that the indicator status can be observed through the window in the waterproof box cover after the waterproof box cover is reinstalled.
  • Page 187: Optional) Installing An In-Room Double Door Magnetic Lock

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-208 Reinstalling the waterproof box cover ----End 3.11.14 (Optional) Installing an In-Room Double Door Magnetic Lock Prerequisites  Verify that the room door is a revolving double-swing wooden door, and that the door frame is wider than 42 mm.
  • Page 188 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-209 Marking mounting holes (1) Door frame (2) Cutout template (3) Door panel Step 3 Remove the hoisting strip using the delivered hex key. Four hex socket screws need to be removed in this step.
  • Page 189 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-211 Installing a magnetic lock Step 5 Route the magnetic lock cable through the cable hole, and secure the magnetic lock using a hex key, as shown by (2) in Figure 3-211.
  • Page 190: Optional) Installing An In-Room Single Door Magnetic Lock

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-213 Installing the magnet (1) Rubber pad Step 7 (Optional) Adjust the magnet. If the magnet cannot attract the door properly after power-on, place a magnetized metal part near the magnet to check whether the magnet provides a proper magnetic force.
  • Page 191 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-214 Marking mounting holes (1) Door frame (2) Cutout template (3) Door panel Step 3 Remove the hoisting strip using the delivered hex key. Two hex socket screws need to be removed in this step.
  • Page 192 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-216 Installing a magnetic lock Step 5 Remove the small cover from the magnetic lock, and route the cable out of the cable hole, as shown in Figure 3-217.
  • Page 193 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-218 Installing positioning pins of a magnet Insert the assembled magnet into the positioning holes in the door, and secure the magnet to the door using the screws and rubber pad delivered with the magnetic lock, as shown Figure 3-219.
  • Page 194: Optional) Installing An In-Room Fingerprint And Card Reader With A Keypad

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation 3.11.16 (Optional) Installing an In-Room Fingerprint and Card Reader with a Keypad Context  The BOM number of a fingerprint and card reader with a keypad is 02070174.
  • Page 195: Optional) Installing An In-Room Fingerprint And Card Reader

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-221 Marking mounting holes (unit: mm) Step 3 Install the baseplate, as shown by (3) in Figure 3-220. Step 4 Route the cable of the fingerprint and card reader with a keypad through the cable hole in the...
  • Page 196 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Procedure Step 1 Remove the screws (set aside) from the fingerprint and card reader and take off the baseplate, as shown by (1) in Figure 3-222. Figure 3-222 Installing a fingerprint and card reader Step 2 Mark the mounting holes using a marker, and drill holes using a hammer drill.
  • Page 197: Optional) Installing An In-Room Card Reader With A Keypad

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation The fingerprint and card reader is connected to the access actuator by a network cable. Step 5 Check that cables are correctly connected. Step 6 Secure the fingerprint and card reader to the baseplate, as shown by (5) and (6) in Figure 3-222.
  • Page 198: Optional) Installing An In-Room Exit Button

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-225 Marking mounting holes (unit: mm) Step 3 Install the baseplate, as shown by (3) in Figure 3-224. Step 4 Route the cable of the card reader with a keypad through the cable hole in the baseplate, as...
  • Page 199: Optional) Installing An In-Room Emergency Door Release Button

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation The exit button is connected to the access actuator by a network cable. Step 5 Route the cable through the cable hole. Step 6 Reinstall the exit button and the cover.
  • Page 200: Optional) Installing An In-Room Camera

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 3 Hardware Installation Figure 3-227 Marking mounting holes (unit: mm) Step 3 Drill holes using a hammer drill, and route cables out of the cable hole. Step 4 Install the emergency door release button.
  • Page 201: Cable Routing

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Cable Routing 4.1 System Cabling Rules Attaching Cable Labels A cable label must be consistent with the corresponding IT cabinet number. Find the corresponding cable based on the wiring diagram in the cable fitting bag, and attach the corresponding cable label taken out from the cable fitting bag to both ends of the cable by wrapping the ends.
  • Page 202 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-1 Neatly organizing cables Keep a large number of cables neat and appealing in a network cabling cabinet by using cable organizers. Move the excess parts of cables in unnoticeable positions, as shown in Figure 4-2.
  • Page 203 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-3 Binding cables in different colors Cable Spacing Requirements Comply with the following requirements if possible to lay out different types of cables: Separate AC and DC power cables from diverse non-shielded signal cables. Keep the cable spacing greater than 100 mm or use grounded metal for isolation purposes.
  • Page 204 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing If a number of wire terminals are connected to a multi-point connector, provide slack and arrange them neatly to prevent stress on certain wires, as shown in Figure 4-5.
  • Page 205 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-6 Cutting off the excess part of a cable tie Do not use cable ties at a place where the cables are bent. Otherwise, the cable cores may...
  • Page 206: Cable Routes

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-8 Direction for securing cable ties 4.2 Cable Routes General Cable Route Figure 4-9 shows the routes of power cables and signal cables. When routing cables, leave a distance of at least 100 mm between power cables and signal cables.
  • Page 207 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-9 Cable routes (1) Power cable (2) Signal cable The Converged Cabinet fitting bag contains 70 plastic cable ties that can be installed on holes at the top of the cabinet for binding cables, as shown in Figure 4-10.
  • Page 208 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-10 Installing a plastic cable tie Emergency Fan Cable Route The emergency fan components are installed at the top of the aisle containment by default. The emergency fan power cable needs to be connected onsite, as shown in Figure 4-12.
  • Page 209 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-11 Removing the cover from the XT7 terminal block Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 210 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-12 Connecting cables to the emergency fan component Door Status Sensor Cable Route The door status sensor in each cabinet connects to the AI/DI module at the rear door of the IT cabinet over the delivered cable.
  • Page 211 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-13 Door status sensor cable routes Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 212 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Smart ETH Gateway Cable Route Figure 4-14 Smart ETH gateway cable routes (1) Power cable (2) Signal cable Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 213: Power Cable Routing

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing 4.3 Power Cable Routing Figure 4-15 Power cable routing (1) Power cable from the battery to (2) Mains input power (3) PDU2000 power the UPS cable cable The customer can purchase power cables as required. The recommended specifications of mains input power cables are as follows: ...
  • Page 214 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-16 Converged Cabinet ground bar (1) General ground bar Figure 4-17 Cabinet ground point (1) General ground point Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 215: Cable Connections To The Power Supply And Distribution System

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-18 Grounding the Smart Module (1) General ground bar 4.5 Cable Connections to the Power Supply and Distribution System 4.5.1 Top Cable Routing 4.5.1.1 Cable Routing Description Figure 4-19 shows the cable holes for routing cables over the top of the Converged Cabinet.
  • Page 216 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing hole (5) Input power cable hole (6) Cable hole for the emergency fan power cable, battery power cable, and output power cable Rodent-proof meshes or cable protecting rings are installed at the cable outlets of cabinets for ease of cable routing.
  • Page 217 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-22 Removing the cover from the N busbar Cables can be bound to the side panel or mounting bar of the Converged Cabinet. Figure 4-23 shows the place for binding cables routed across the cabinet interior.
  • Page 218: Optional) Connecting Signal Cables To The Converged Cabinet

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing 4.5.1.2 (Optional) Connecting Signal Cables to the Converged Cabinet Prerequisites The ATS PDU has been configured. Context If the Converged Cabinet is configured with an ATS PDU, connect the diesel generator (DG) and fire extinguishing signal cables to the XT6 terminal block.
  • Page 219: Connecting Output Power Cables To The Converged Cabinet

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-24 Connecting signal cables ----End 4.5.1.3 Connecting Output Power Cables to the Converged Cabinet Context The Converged Cabinet has multiple configurations. This section describes how to connect output power cables to different types of power distribution subracks in the Converged Cabinet.
  • Page 220 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-25 Preparing a cord end terminal (1) Cable (2) Cord end terminal (3) Crimping tool Figure 4-26 Preparing an OT terminal (1) Cable (2) Heat shrink tubing...
  • Page 221 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-27 Connecting output power cables to the 6 U PDU (1) IT cabinet output power cable (2) Smart Cooling Product output power cable Step 2 (Optional) Connect output power cables to the 3 U PDU.
  • Page 222: Connecting Input Power Cables To The Converged Cabinet

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-28 Connecting output power cables to the 3 U PDU (1) Smart Cooling Product output power cable (2) IT cabinet output power cable ----End 4.5.1.4 Connecting Input Power Cables to the Converged Cabinet Context The Converged Cabinet has multiple configurations.
  • Page 223 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing  Perform this step only when the system has double power inputs.  Ensure that cables to the power distribution box on the customer side are connected in correct phase sequence.
  • Page 224 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-30 Connecting input power cables to the 6 U PDU (1) Input power cable Step 3 (Optional) Connect input power cables to the 3 U PDU. Issue 10 (2019-12-20)
  • Page 225: Bottom Cable Routing

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-31 Connecting input power cables to the 3 U PDU (1) Input power cable ----End 4.5.2 Bottom Cable Routing Cables connect to the same positions on the power distribution subrack irrespective of whether cables are routed through the top or bottom of the Converged Cabinet, but the cable routes inside the cabinet are different.
  • Page 226 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-32 Cable holes for routing cables through the bottom of the Converged Cabinet (1) Smart Cooling Product water inlet pipe and (2) Hole for the signal cable and water...
  • Page 227: Connecting A Pdu2000 Power Cable

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-33 Cable route example in the bottom cable routing scenario (3 U PDU for example) 4.5.3 Connecting a PDU2000 Power Cable Procedure Step 1 Connect the cord end terminal on the IT cabinet output power cable routed out of the...
  • Page 228: Connecting Cables Between The Battery And The Ups

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-34 Connecting a PDU2000 power cable Step 2 Connect other PDU2000 power cables in the same way. ----End 4.5.4 Connecting Cables Between the Battery and the UPS For details, see the manual delivered with the UPS.
  • Page 229: Connecting A Monitoring Cable To The Door Status Sensor

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing output (10) RS485 port (11) Default button (12) USB port (COM1–4/12 V) (13) ECC800 main control module 4.6.2 Connecting a Monitoring Cable to the Door Status Sensor Prerequisites The door status sensor has been installed.
  • Page 230: Connecting Vcn Cables

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-37 Installing door status sensor cables Step 5 Reinstall the cover on the door status sensor. The cable holes in the door status sensor cover should match the positions of the door status sensor cables.
  • Page 231: Connecting A Monitoring Cable To The Smart Eth Gateway

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-38 Ports on the VCN (1) Ground point (2) GE2 port (3) Power switch (4) Power input port (5) GE1 port The figure uses the VCN500 as an example.
  • Page 232: Connecting A Monitoring Cable To The Ai/Di Module

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-39 Ports on a smart ETH gateway (1) PWR_IN cascading (2) FE_1 cascading signal (3) PoE_1–2 ports power port port (4) PoE_3–4 ports (5) 48V_OUT1 power output...
  • Page 233: Connecting The Smoke Detector Monitoring Cable

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Figure 4-40 Ports on the front panel of the standalone AI/DI module (1) DC 15 V power input port (2) Indicators (3) DIP switch (4) Cascading ports (5) AI/DI_1 to AI/DI_8...
  • Page 234: Connecting Cables To Water Sensors

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Procedure Step 1 Disconnect the male and female connectors on the cable delivered with the smoke detector, as shown in Figure 4-41. Figure 4-41 Disconnect the connectors on the cable delivered with the smoke detector...
  • Page 235: Optional) Connecting Cables For The In-Room Access Control System

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing 4.6.8 (Optional) Connecting Cables for the In-Room Access Control System Prerequisites  The required cables have been prepared.  It is recommended that cables of the in-room access control system be routed through a trough in a wall.
  • Page 236 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 4 Cable Routing Procedure Step 1 Remove the covers from the waterproof box and cable holes of the access actuator. Step 2 Connect cables by referring to Figure 4-44. Connect the smart ETH gateway to the access actuator using a cable.
  • Page 237: Checking After Installation

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 5 Checking After Installation Checking After Installation Smart Cooling Product Installation Check Table 5-1 Indoor unit installation checklist Item Check That Check Result □ Passed □ Failed The fan is secured.
  • Page 238 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 5 Checking After Installation Table 5-3 Pipe connection checklist Check That Check Result □ Passed □ Failed Pipe connectors are correct. The refrigerant pipe tilts and has supports. □ Passed □ Failed The hose clamps and cable ties of the drainpipe are secured.
  • Page 239 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 5 Checking After Installation Check That Check Result is left onsite. □ Passed □ Failed Block empty cable holes using plugs or lids. Cable Installation Check Table 5-5 Cable installation check items...
  • Page 240 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 5 Checking After Installation Check That Check Result □ Passed □ Failed Lugs for power cables and PGND cables are soldered or crimped securely. □ Passed □ Failed Power cables and PGND cables are routed and bundled separately from other cables.
  • Page 241: Power-On Commissioning

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Power-On Commissioning 6.1 Power-On Commissioning for the ATS Procedure Step 1 Operate the handle to switch on and off the ATS for one to three times to ensure that the primary and secondary contacts of the ATS can be switched smoothly.
  • Page 242: Power-On Commissioning For The Power Supply And Distribution System

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Table 6-2 Setting generator parameters Main Menu Second-Level Default Value Setting Menu System Generator Usage No Generator No Generator or Configuration Generator In Use ----End 6.2 Power-On Commissioning for the Power Supply and...
  • Page 243 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-1 Circuit breakers on the front panel of the Converged Cabinet (1) ATS controller (2) IT output circuit breakers (3) UPS maintenance bypass circuit breaker (4) UPS input and output...
  • Page 244: Management System Power-On Commissioning

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Table 6-3 Set UPS parameters Parameter Default Value Setting Value Batteries (10 kVA Set as required. UPS) Positive batteries/Negative batteries (20 kVA UPS) Battery capacity = Capacity of a single battery...
  • Page 245 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning  The default user with operation rights is operator. The preset password is Changeme. The operator user has no rights for parameter setting, control, and maintenance that may affect system running.
  • Page 246: Preparations And App Login

    After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 247 Install the HUAWEI App Store. If the downloaded file exists in the drop-down list box, tap the file to install the HUAWEI App Store. If the downloaded file does not exist in the drop-down list box, choose File > Local on the desktop, find the Download folder, and click the HUAWEI App Store installation package.
  • Page 248 Yes: Contact Huawei technical support.  No: Correct the setting and check whether the verification code can be displayed. If the verification code still fails to be displayed, contact Huawei technical support. ----End Issue 10 (2019-12-20) Copyright © Huawei Technologies Co., Ltd.
  • Page 249: Setting The Date And Time

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning 6.3.3 Setting the Date and Time Procedure Step 1 Set the system date to the actual date upon the first login of the ECC800 WebUI. Path: System Settings > Time Settings.
  • Page 250: Commissioning The Sensor

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Path Parameter Setting Name port connected to the independent deployment AI_DI unit. Device In this example, Device address is set to 1. During address actual configuration, set the device address for the independent deployment AI_DI unit based on the actual situation.
  • Page 251: Commissioning The Water Sensor

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Table 6-6 Commissioning the sensor Check Method Normal Connection Status Alarm Clearance Method Simulate a smoky Smoke DI alarm is displayed on Press the reset button of the...
  • Page 252: Commissioning The Door Status Sensor

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Procedure Step 1 Set temperature sensor parameters. In this example, the temperature sensor is connected to the AI/DI_2 port on the ECC800. Log in to the ECC800 WebUI as an administrator.
  • Page 253: Optional) Commissioning The In-Room Access Control System

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Set Door1 sensor to Enable and click Submit. Set Door1 sensor type to Door sensor, ensure that Door1 power supply is Yes, and click Submit. Perform the preceding operations to set parameters for ports AI/DI_2 to AI/DI_8.
  • Page 254 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-3 Adding access users On the Authorization Information and Term of Authorization tab pages, select access users whose access permissions are to be set, and set Authorized Device, Authorization Mode, Cabinet Lock, Start time, and End time.
  • Page 255 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-4 Adding access permissions You can authorize and delete access users in batches. Click OK to complete the task of adding access management settings. On the Authorization Operations tab page, click Synchronize to Device, select the modified access control devices, and click Start Synchronization.
  • Page 256: Optional) Commissioning An In-Room Exit Button

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Running Parameters, and set Logical level configuration for reader removed of the corresponding card reader to High level alarm. Table 6-10 Setting method Cable Connection Scenario Setting Method...
  • Page 257: Optional) Commissioning An In-Room Emergency Door Release Button

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Table 6-12 Function check Check That Normal Connection Status Open the door by pressing the exit button The room door is opened properly. when the aisle door is properly closed.
  • Page 258: Networking Iboxs And Ibats In Wireless Mode

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Parameter Description Remarks time installed Single battery Single battery capacity refers to the Obtain the battery capacity capacity capacity of a single battery in a battery from the battery label or string managed by the iBOX.
  • Page 259: Setting Alarm Notification By Email And Sms

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Step 2 Press the iBAT networking switch for 2 seconds. When the RUN/ALM indicator turns from steady red to blinking green at super short intervals (iBattery 2.0) or short intervals (iBattery 3.0), and finally to blinking green at long intervals, the iBAT connects to the iBOX network.
  • Page 260 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-6 Setting the Outbox Setting parameter  Click Test to test whether the email is sent successfully. If the email fails to be sent, check the sender's email parameter settings; if the email is sent successfully, click Submit.
  • Page 261 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Email Email Mailbox Server Encryption Remarks Type Server IP Address Mode and Domain SMTP port Name of the blinking password at 139 Mail smtp.139.com Non-encryption: cursor and Password for...
  • Page 262 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-8 Setting the Alarm notification delay time parameter Figure 6-9 Adding alarm notification Mailbox Address in Alarm Notification can be selected after it is added in Mailbox Settings.
  • Page 263: Commissioning Cameras And A Vcn (Smart Eth Gateway Networking Scenario)

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Follow-up Procedure To modify or delete the email parameter settings, click Confirm or Delete button, the re-authentication page is displayed. Enter Login password and click Submit. 6.3.10 Commissioning Cameras and a VCN (Smart ETH Gateway...
  • Page 264 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning the IPC6325 camera automatically obtains an IP address that is in the same network segment as the ECC800 IP address.  Before commissioning the IPC6325 camera, set the IP address for the IPC6325 camera based on customer requirements.
  • Page 265 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Name: Enter the camera name (for example, Camera1). − − External IP: Enter the external IP address of the camera (The IP address assigned by the network administrator prevails).
  • Page 266 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning (Optional) If you use the SD card when no VCN is configured, perform commissioning by following the instructions in 6.3.10.2 Commissioning IPC6325 Camera (SD Card Configured). Set camera stream type, primary stream, and secondary stream 1 parameters.
  • Page 267: Commissioning Ipc6325 Camera (Sd Card Configured)

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-14 Setting secondary stream 1 parameters ----End Follow-up Procedure Commission the other cameras by referring to this section. 6.3.10.2 Commissioning IPC6325 Camera (SD Card Configured) Context If the VCN is not configured and an SD card is chosen, perform the following procedure.
  • Page 268 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-15 Setting audio and video parameters If longer-time video storage is required, set camera parameters according to the following table. Table 6-17 Camera configuration parameters Condition Result...
  • Page 269 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-16 Setting motion detection parameters Step 4 Set the deployment policy. Figure 6-17 Setting the deployment policy Step 5 Set the alarm linkage policy. Figure 6-18 Setting the alarm linkage policy...
  • Page 270: Setting Parameters On The Vcn Webui

    After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 271 OMU Portal system.  (Optional) Deploying IVS in Stack Mode. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying IVS in Stack Mode. Issue 10 (2019-12-20)
  • Page 272: Setting Parameters On The Vcn Ivs Client

     (Optional) Deploying MPUs in Cluster Mode. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying MPUs in Cluster Mode. For the VCN500, search for VCN500 Product Documentation. For the VCN540, search for VCN510&VCN520&VCN540 Product Documentation.
  • Page 273 After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 274: Power-On Commissioning For The Cooling System

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Click Next to complete the recording plan setting. When is displayed in the status bar, the recording plan has been set successfully. Click Finish. Step 4 Create a user.
  • Page 275: Initial Configuration

    12 hours. Otherwise, Huawei will not repair the compressor. Step 2 Commission the system after the electric heating belt of the crankcase has been preheated for 12 hours.
  • Page 276: Setting Teamwork Control Parameters

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Figure 6-23 T/H sensor layout and DIP switch address (3 cabinets and 1 smart cooling product) ----End 6.4.2.2 Setting Teamwork Control Parameters Context Teamwork control parameters have the following bidirectional coupling relationships: Number of running units ≤...
  • Page 277 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Table 6-19 Setting teamwork control parameters for two smart cooling products Parameter Smart Cooling Product No. Teamwork function Enable Enable Teamwork group no. Teamwork unit address Total number of units...
  • Page 278: Setting Max Speed Of Indoor Fan

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Step 4 After setting teamwork control parameters, choose Monitoring > Air Conditioner > NetCol5000-A0101 > Running Info > Teamwork Information and check that the displayed teamwork control information is consistent with the parameter settings.
  • Page 279 (L). L should be less than or equal to 60 meters. If L exceeds 60 meters, contact Huawei technical support.
  • Page 280 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning  Remove the refrigerant cylinder after ensuring that no refrigerant is required.  Users are categorized as admin (preset password: Changeme) and operator (preset password: Changeme). To enter the diagnostic mode, log in as admin.
  • Page 281 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Step 7 Commission the compressor. On the Diagnostic Mode Parameters page, set Comp manual control to 3000 rpm. Choose Running Info > Compressor Information and view the Suction pressure and Discharge pressure to determine whether they are within normal ranges.
  • Page 282 6 Power-On Commissioning Tighten the needle valve bonnets after the charge is complete. Check whether a needle valve leaks by applying soapy water to the valve vent or using a halogen leak detector. If it leaks, contact Huawei technical support.
  • Page 283 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) 6 Power-On Commissioning Exception Handling Step 1 Check that you have exited the diagnostic mode on the ECC800 WebUI. Step 2 Check that the T/H control mode and T/H setpoint are properly set.
  • Page 284: A Appendix

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Appendix A.1 Installing Expansion Sleeves Procedure Step 1 Drill a hole at the position for installing the expansion bolt using a hammer drill with the hole depth of 52 mm to 60 mm.
  • Page 285: Routing Monitoring Cables

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-2 Drilling a hole and installing an expansion sleeve (unit: mm) ----End A.2 Routing Monitoring Cables If no smart ETH gateway is configured onsite, connect the third smart cooling product to the WAN_2 port on the ECC800.
  • Page 286 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-3 Cable connections to the management system Table A-1 Description about the management system cable connections From Remarks GE1 port on the VCN PoE_1 port on the smart...
  • Page 287 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix From Remarks sensor standalone AI/DI module COM1/12 V port on the Factory-installed ECC800 FE_1 port on the first LAN_1 port on the Factory-installed smart cooling product ECC800 WiFi module...
  • Page 288 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix From Remarks Smart ETH gateway Access actuator Connected onsite Access actuator Card reader with a keypad Connected onsite Access actuator Fingerprint and card Connected onsite reader Fingerprint and card...
  • Page 289: Cable List

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-5 Preparing monitoring cables (RJ12) A.3 Cable list Table A-2 Cable list BOM Number Cable Position 04092766  Emergency fan power cable  Cable from the smart cooling product to the T/H sensor ...
  • Page 290: Cooling System Layout

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix BOM Number Cable Position the aisle containment 04093057 Cable from the battery cabinet to the 20 kVA UPS (required for N+1 configuration and battery string sharing) 04151722/0415172 PDU2000 power cable...
  • Page 291: Installing A Dehumidifier

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-6 Cooling system layout (1) Compressor (2) Oil separator (3) Check valve (4) High pressure switch (6) Liquid storage (7) High pressure (5) Condenser (8) Filter dryer tank...
  • Page 292 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-7 shows the external structure of a dehumidifier. The dehumidifier structure diagram is for reference only. The actual product prevails. Figure A-7 External structure of a dehumidifier (1) Mounting ears...
  • Page 293 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-8 Installing the tray Step 3 Place the dehumidifier on the tray and move it to its installation place, and secure the dehumidifier mounting ears to the rack rail using a floating nut mounting bar and three...
  • Page 294 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix When installing the dehumidifier, verify that the air intake vent faces the cold aisle (as shown by A in Figure A-7), and the air exhaust vent faces the hot aisle (as shown by B in Figure A-7).
  • Page 295 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Figure A-11 Connecting the dehumidifier drainpipe (1) Smart cooling product drainpipe in the (2) Three-way (3) PVC pipe equipment room valve (4) Female adapter (5) Male plug (6) Dehumidifier...
  • Page 296: Checking The Monitoring Parameters For The Factory-Installed Devices

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) A Appendix Step 6 Connect the dehumidifier power cable. Cut off the national standard three-pin plug of the power cable delivered with the dehumidifier, and strip the power cable insulation layer for a proper length.
  • Page 297: B Acronyms And Abbreviations

    FusionModule800 Smart Small Data Center Installation Guide (Six Fans) B Acronyms and Abbreviations Acronyms and Abbreviations alternating current automatic transfer switch battery interface module communication interface module direct current energy control center Ethernet fast Ethernet ibattery iBAT Internet Technology Issue 10 (2019-12-20)
  • Page 298 FusionModule800 Smart Small Data Center Installation Guide (Six Fans) B Acronyms and Abbreviations light emitting diode negative temperature coefficient power distribution unit protective earthing power over Ethernet secure digital memory uninterruptible power system video cloud node Wireless Fidelity WiFi Issue 10 (2019-12-20)

Table of Contents