Figure 4-5 Using a laser locator for positioning in the one-row cabinet scenario
(1) Cabinet outline
(3) Contained aisle
Step 4 Use a right angle to position the end cabinet base, and ensure that the outline of the upper
surface of the base aligns with the cabinet bottom outline on the floor, as shown in
Figure 4-6 Positioning the first base
Step 5 Use the end cabinet base as the reference and place other cabinet bases.
Step 6 Partially install the front and rear pallets on the base, as shown by (1) in
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
(2) Laser locator
Figure
Figure
4-6.
4-7.
25

Advertisement

Table of Contents
loading

Table of Contents