Figure 5-7 Interconnecting cabinets
Step 4 Install other cabinets in a similar way.
Step 5 (Optional) Secure the cabinets, as shown in
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
5-8.
5 Installing the Cabinet