Huawei FusionModule5000 Series Installation Manual page 41

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Procedure
Step 1 Remove the four M6 screws from the support to split the adjustable feet from the base, as
shown in
Figure 4-17 Removing adjustable feet
Step 2 Move the adjustable legs to the 1100 mm silkscreen at the FRONT end.
Step 3 Secure the adjustable feet to the base using the four M6 screws removed in
in
Figure
Issue 01 (2019-03-05)
When deploying the base, place the side marked FRONT facing upwards.
Move the adjustable feet of the PDC base to the cabinet rear (close to the rear door of the
cabinet).
This section takes adjusting the adjustable legs of the PDC in hot aisle containment as an
example to illustrate how to adjust adjustable legs.
Figure
4-17.
4-18.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Step
1, as shown
32