Huawei FusionModule5000 Series Installation Manual page 6

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
4.2.2 Checking the Air Pressure ............................................................................................................................................... 43
4.2.3 Installing Water Pipe Adapters ........................................................................................................................................ 45
4.2.4 Removing Transportation Fasteners for the Air Conditioner ........................................................................................ 47
4.3 Removing Pallets ................................................................................................................................................................ 48
4.3.1 Removing the PDC Pallet ............................................................................................................................................... 49
4.3.2 Removing the IT Cabinet Pallet...................................................................................................................................... 51
4.3.3 Removing the Air Conditioner Pallet ............................................................................................................................. 52
4.4 Adjusting the Baffle Plate for the Air Conditioner ........................................................................................................... 53
4.5 (Optional) Adjusting IT Cabinet Side Plates ..................................................................................................................... 54
4.6 (Optional) Adjusting Battery Cabinet Side Plates ............................................................................................................ 55
4.7 (Optional) Installing the PDC Tail Frame ......................................................................................................................... 56
4.8 Routing Air Conditioner Pipes ........................................................................................................................................... 60
5 Installing the Cabinet.......................................................................................................... 62
5.1 Installing Cabinets (with Bases) ........................................................................................................................................ 62
5.2 Positioning Cabinets (Without Bases) ............................................................................................................................... 65
5.3 Installing Cabinets (Without Bases) .................................................................................................................................. 66
5.4 Installing Cabinet Accessories ........................................................................................................................................... 70
5.4.1 (Optional) Taking Out PDU2000 Cables and Industrial Connectors ........................................................................... 70
5.4.2 (Optional) Installing Branch Ground Copper Bars........................................................................................................ 72
5.4.3 (Optional) Installing the Vertical Ground Bar................................................................................................................ 73
5.4.4 (Optional) Setting a Mechanical Coded Lock ............................................................................................................... 74
6 Installing the Contained Aisles.......................................................................................... 77
6.1 Installing Sealing Plates ..................................................................................................................................................... 77
6.2 Installing Skylights ............................................................................................................................................................. 79
6.2.1 Skylight Overview ........................................................................................................................................................... 79
6.2.1.1 600 mm Wide Control Skylight ................................................................................................................................... 79
6.2.1.2 800 mm Wide Control Skylight ................................................................................................................................... 80
6.2.1.3 600 mm Wide Flat or Rotating Skylight ..................................................................................................................... 80
6.2.1.4 800 mm Wide Flat or Rotating Skylight ..................................................................................................................... 81
6.2.1.5 300 mm Wide Flat Skylight ......................................................................................................................................... 82
6.2.2 Securing Skylights ........................................................................................................................................................... 83
6.2.3 Installing a Rotating Skylight Magnetic Lock ............................................................................................................... 85
6.3 Installing End Doors ........................................................................................................................................................... 86
6.3.1 Installing a Cabinet Lower Mounting Kit ...................................................................................................................... 87
6.3.2 Installing a Revolving Door ............................................................................................................................................ 89
6.4 Attaching Cabinet Labels ................................................................................................................................................... 99
6.5 (Optional) Installing Aisle Lights ....................................................................................................................................101
7 (Optional) Installing the New Main Way ....................................................................... 104
8 (Optional) Installing Cable Troughs ............................................................................... 105
8.1 Installing a 600 mm Wide Cable Trough.........................................................................................................................105
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Contents
v

Advertisement

Table of Contents
loading