Table 1-4 General tools
Name, Specifications, and Appearance
Protective gloves
Step ladder (2 m)
Adjustable wrench
(6")
Torque wrench (28
mm)
Electric screwdriver
Laser locator
Issue 01 (2019-03-05)
Marker
Phillips screwdriver
(M4, M6, and M8)
Socket wrench
M4/M6/M8/M12
Solid wrench
(12#/13#/18#)
Hand drill (Φ3,
Φ3.7, Φ4, Φ4.5, Φ5,
Φ6, Φ10, and Φ12
drill bits)
Electrician's knife
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Installation Preparations
Measuring tape (5
m)
Phillips screwdriver
M4 (length < 100
mm)
Hex key
Cotton cloth
Hammer drill (Φ16
drill bit)
Impact tool
Level
Flat-head
screwdriver (2–5
mm)
Box-end wrench
(M6, M8, and M12)
Labels
Heat gun
Polyvinyl chloride
(PVC) insulation