Figure 4-45 Securing the tail frame
Step 7 Install the hinges and connecting plates removed in
the tail frame.
Step 8 Install the PDC rear door on the tail frame.
After installing the PDC rear door, ensure that ground cables are properly connected to the
cabinet and PDC rear door.
----End

4.8 Routing Air Conditioner Pipes

Preinstall the air conditioner pipes by referring to the onsite engineering layout diagram and
NetCol5000-C 30 kW Chilled Water In-Row Precision Air Conditioner Quick Guide
Issue 01 (2019-03-05)
Align the upper and lower holes before tightening screws.
The tail frame side with anchor bolts should face the cabinet bottom.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Step 4
on the corresponding positions on