Huawei FusionModule5000 Series Installation Manual page 132

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 9-18 Removing front and inner covers
2.
Gently insert the micro SD card into the SD card slot, as shown in
Figure 9-19 Installing an SD card
Step 2 Align the holes in the camera base with those in the control skylight, and secure the camera to
the control skylight using three M3 screws, as shown in
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing Monitoring Devices
Figure
9-19.
Figure
9-20.
123

Advertisement

Table of Contents
loading

Table of Contents