FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 9-3 Installing guide rails
1.
Place the guide rails horizontally at the installation position in the cabinet, as shown by
(1) in
2.
Fix the guide rails using rubber plugs, as shown by (2) in
3.
(Optional) To enhance the rigidness and seismic-proof performance of a server, you can
install bolts at the rear of flexible guide rails, as shown by (3) in
Step 2 Place the server on the guide rails and slide it along the guide rails into the cabinet.
Step 3 Align the two mounting ears of the server with the rack rail of the cabinet and tighten the
screws on the mounting ears.
Figure 9-4 Installing the server
Issue 01 (2019-03-05)
Figure
9-3.
In front of the guide rails: If a server is installed using the upper mounting holes,
insert rubber plugs tightly into the holes at the middle. If a server is installed using
mounting holes at the middle, insert rubber plugs tightly into the upper holes.
Behind the guide rails: Insert rubber plugs tightly into the upper mounting holes.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9 Installing Monitoring Devices
Figure
9-3.
Figure
9-3.
114