Huawei FusionModule5000 Series Installation Manual page 158

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 9-53 Securing the pad mounting kit
Step 4 Insert the pad power adapter into the power connector. Bind the access monitoring cable at
the bottom of the power connector holder. Route the access monitoring cable along the outer
side of the power connector holder and route the cable out through the cable hole in the door
box, as shown in
Skip this step if no pad is installed. Route the access monitoring cable from the cable hole in the door
box baffle plate, as shown in
Issue 01 (2019-03-05)
Figure
9-54.
Figure
9-55.