Huawei FusionModule5000 Series Installation Manual page 67

Smart modular data center single-row aisle containment with 2000 mm high cabinets, ecc800
Hide thumbs Also See for FusionModule5000 Series:
Table of Contents

Advertisement

FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 4-42 Installing the upper sealing plates of a tail frame
Step 3 Open the PDC rear door, and remove it, as shown in
When removing the cabinet rear door, remove the ground cable between the cabinet and the
rear door from the cabinet.
Figure 4-43 Removing the cabinet rear door
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Figure
4-43.
58

Advertisement

Table of Contents
loading

Table of Contents