FusionModule5000 Smart Modular Data Center
Installation Guide (Single-Row Aisle Containment with
2000 mm High Cabinets, ECC800)
Figure 4-32 Removing the L-shaped bracket
Ensure that the sliding plates are properly installed in step 2 in
may shift when the PDC is unloaded.
Step 7 Raise the four leveling feet using an adjustable wrench, as shown in
Figure 4-33 Raising the leveling feet
Step 8 Move the PDC over its castors to the installation position.
----End
Issue 01 (2019-03-05)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Hardware Installation Preparations
Figure
4-32. Otherwise, the sliding plates
Figure
4-33.
50