Figure 4-32 Removing the L-shaped bracket
Ensure that the sliding plates are properly installed in step 2 in
may shift when the PDC is unloaded.
Step 7 Raise the four leveling feet using an adjustable wrench, as shown in
Figure 4-33 Raising the leveling feet
Step 8 Move the PDC over its castors to the installation position.