5.7.2 Installing a Front I/O Module

This topic describes how to install a front I/O module.
Scenarios
Install a front I/O module if:
Prerequisites
Conditions
Data
Tools
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see
Step 2 Take out the front I/O module from the ESD bag, and install the internal
components, such as the RAID controller card, supercapacitor, and hard disk
backplane.
Step 3 Gently insert the front I/O module into the slot while holding the ejector levers on
the front I/O module. See step (1) in
Step 4 Lower the ejector levers on the front I/O module. See step (2) in
Issue 30 (2019-12-19)
The front I/O module has failed.
A RAID controller card on the front I/O module has failed.
A supercapacitor on the front I/O module has failed.
A hard disk backplane has failed.
You have powered off the RH8100 V3. For details, see
RH8100
V3. Then you have removed all power cables from the server.
You have installed RAID controller cards on the front I/O module to be
installed. For details, see
You have installed supercapacitors on the front I/O module to be installed. For
details, see
5.7.7 Removing a
You have installed the hard disk backplane on the front I/O module to be
installed. For details, see
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
You have determined the position on the RH8100 V3 for removing the front
I/O module.
ESD gloves
Packaging materials, for example, an ESD bag
Copyright © Huawei Technologies Co., Ltd.
5 Removing and Installing Parts of the RH8100 V3
5.7.5 Removing a RAID Controller
Supercapacitor.
5.7.9 Removing a Hard Disk
Figure
5-94.
6.2 Powering Off the
Card.
Backplane.
1 Safety
Instructions.
Figure
5-94.
210

Advertisement

Table of Contents
loading

Table of Contents