Huawei RH8100 V3 User Manual page 310

Table of Contents

Advertisement

RH8100 V3 Server
User Guide
Requirements
Prerequisites
Data
Tools
Hardware
Rear I/O board to be installed
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see
Step 2 Take the spare rear I/O board out of its ESD bag.
Step 3 Install the rear I/O board in the arrow direction. See step (1) in
Step 4 Tighten all screws on the rear I/O board. See step (2) in
Issue 30 (2019-12-19)
You have powered off the server. For details, see
RH8100
V3. After the server is powered off, disconnect all the power cables.
You have removed the rear I/O module from the server and have removed all
PCIe cards from the rear I/O module. For details, see
I/O
Module,
5.11.3 Removing a Hot-Swappable PCIe
Removing a Non-Hot-Swappable PCIe
You have determined the position on the RH8100 V3 for installing the rear I/O
board.
You have obtained the cabinet number and chassis number of the RH8100 V3.
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
ESD gloves
Packaging materials, for example, an ESD bag
Copyright © Huawei Technologies Co., Ltd.
5 Removing and Installing Parts of the RH8100 V3
6.2 Powering Off the
Card.
5.11.1 Removing a Rear
Card, and
5.11.5
1 Safety
Instructions.
Figure
5-166.
Figure
5-166.
300

Advertisement

Table of Contents
loading

Table of Contents