RH8100 V3 Server
User Guide
Figure 5-28 Removing an indicator board
Step 6 Place the removed indicator board in an ESD bag.
----End
5.4.2 Installing an Indicator Board
This topic describes how to install an indicator board.
Scenarios
Install an indicator board if the original one has failed.
Prerequisites
Conditions
You have powered off the RH8100 V3. For details, see
RH8100
Data
Issue 30 (2019-12-19)
V3. Then you have removed all power cables from the server.
Copyright © Huawei Technologies Co., Ltd.
5 Removing and Installing Parts of the RH8100 V3
6.2 Powering Off the
142