Step 4 Check the indicator status after the G530 V2 is powered on.
For details, see
----End

4.5 Installing an I/O Module

The G5500 is connected to the external network through the I/O module. If the I/O module is
not installed, install it in the I/O module slot of the G5500 before installing the G5500.
l
l
For details about installing an I/O Module, see

4.6 Internal Cabling

4.6.1 SAS Cable

Table 4-2 Cable description
Cable
SAS cable
Issue 02 (2017-12-15)
Insert the G530 V2 horizontally into the chassis. See (3) in
Close the ejector lever on the G530 V2. See (4) in
2.3 Front Panel Indicators and
For details about I/O modules, visit
The NICs on the G5500 must be compatible with I/O modules.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
Buttons.
Server Compatibility
6.7 I/O
Module.
Description
Connects the RAID
controller card to a
mezzanine card.
Figure
4-20.
4-20.
Checker.
BOM Number
04052026