Procedure
Step 1 Specify the server installation position.
Issue 30 (2019-12-19)
A server of another model needs to be replaced with the RH8100 V3.
A cabinet is properly installed.
The installation environment is ready. For details, see
Overview.
ESD gloves
ESD wrist strap
Phillips screwdriver
Figure 3-2
shows the position in which the floating nuts are installed.
When you install the guide rails, make sure that screws are not installed in
the four lower square holes shown in the
installing the chassis.
Copyright © Huawei Technologies Co., Ltd.
3 Installing the RH8100 V3
3.1 Installation
Figure
3-2. The holes are used for
84

Advertisement

Table of Contents
loading

Table of Contents