Further Information About Communication Via Profinet Io - Siemens SINAMICS G130 Operating Instructions Manual

Converter built-in units 75 kw-800 kw
Hide thumbs Also See for SINAMICS G130:
Table of Contents

Advertisement

6.8.6

Further information about communication via PROFINET IO

Further information about communication via PROFINET IO
For more information about PROFINET IO communication, refer to "PROFINET IO
communication" in the accompanying "SINAMICS S120 Function Manual".
6.9
Communication via SINAMICS Link
6.9.1
Basic principles of SINAMICS Link
SINAMICS Link allows data to be directly exchanged between a maximum of 64 Control
Units (CU320-2 PN and CU320-2 DP). The participating Control Units must be equipped with
the CBE20 supplementary module. Other nodes cannot be integrated into this
communication.
Possible applications include e.g.:
● Torque distribution for n drives
● Setpoint cascading for n drives
● Load distribution of drives coupled through a material web
● Master/slave function for infeed units
Preconditions
The following preconditions must be fulfilled to operate SINAMICS Link:
● r0108.31: Function module "PROFINET CBE20" must be activated.
● r2064[1]: The bus cycle time (T
controller cycle).
● r2064[2]: The master cycle time (T
control cycle).
● p0115[0]: The current controller clock cycle must be set to 250 µs or 500 µs. One clock
cycle with 400 µs is not permitted. For 400 μs, alarm A01902 is output with alarm value
"4". As countermeasure, set the current controller cycle with p0115[0] to 500 µs.
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A
6.9 Communication via SINAMICS Link
) must be an integer multiple of p0115[0] (current
dp
) must be an integer multiple of p0115[1] (speed
mapc
Operation
271

Advertisement

Table of Contents
loading

Table of Contents