Commissioning
5.3 Procedure for commissioning via STARTER
NOTICE
Material damage when selecting the incorrect encoder supply voltage
Once the encoder has been commissioned, the supply voltage (5/24 V) set for the encoder
is activated on the SMC30 Module. If a 5 V encoder is connected and the supply voltage
has not been set correctly, the encoder may be damaged.
• Set the correct supply voltage for the connected encoder.
Default settings for setpoints/command sources
Figure 5-27
⇒ Under Command sources:, choose and Setpoint sources: choose the appropriate settings
for your device configuration.
154
Default settings for setpoints/command sources
Inverter chassis units
Operating Instructions, 07/2016, A5E00331449A