Switch Settings - NEC Electra Elite IPK II System Hardware Manual

Hide thumbs Also See for Electra Elite IPK II:
Table of Contents

Advertisement

Electra Elite IPK II
___________________________________________________________________________________
___________________________________________________________________________________
System Hardware Manual
4.
Close the base plate, lead the AC adapter cord out through the
hole, and snap the cover in place.
5.
Install a ferrite core (provided with the APR-U Unit) by looping
line cord through the core between the terminal (one inch from
the terminal) and ESI(8)-U10 ETU. This core is only used with
the APR-U Unit.
6.
Plug in the power cord on the AC adapter and the telephone
cord in the jack.
3.4.2

Switch Settings

The APR-U Unit has two switches.
Figure 11-22 Closing the Base Plate Cover
Figure 11-23 APR-U Unit Switches
Document Revision 3
11 - 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents