Figure 219: Open Baskets
d. Connect all of the SAS cables that will be used and route them through the baskets
one at a time. Make sure to follow the labels to make sure they are connected to the
proper port.
e. If the installation includes more than 10 total cables, follow the recommendations in
Special Considerations for Cable Routing
proceeding.
Note: Each cable must be given enough slack at the connector end to
operate smoothly. For the lower CMA allow 20" - 21" (508 – 533.4mm)
between the connector and the first basket.
(page 201). Read this section before
276
5. System Management
5.5 Daisy Chaining

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ultrastar Data102 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ultrastar h4102-j

Table of Contents