Main Menu
Front Pillar Seal/Retainer
Replacement (cont'd)
22. Let the sealant dry for at least three hours after
installing the front pillar seal.
23. Install the roof on the body, then check that the
seals fit flush (see page 20-107).
NOTE: If necessary, align the roof side seal by
adjusting the roof side lock unit (see page 20-106).
24. Check that each door glass contact the seals evenly
(see page 20-109).
25. Check for water leaks (see page 20-110).
26. Remove the roof, then reinstall all remaining removed
parts.
Table of Contents