Download Print this page

Ignition Switch - Suzuki GA413 Service Manual

Hide thumbs Also See for GA413:

Advertisement

8-20 BODY ELECTRICAL SYSTEM
1. Steering column assembly

2. Ignition switch

INSPECTION
Connect battery and two test bulbs (12 V, 27 W) as shown.
Unless a continued flash on and off is visible, replace relay.
Reference flashing cycle: 60 – 120 cycle/minute
1. Hazard relay
2. Test bulb (12 V, 27 W)
IGNITION SWITCH
INSPECTION
1) Disconnect negative cable at battery.
2) Remove steering column upper and lower cover.
3) Disconnect wiring main harness coupler from ignition switch.
4) Use an ohmmeter to check the continuity at each switch posi-
key
ACC : Accessory
REMOVAL AND INSTALLATION
Refer to STEERING LOCK ASSEMBLY (IGNITION SWITCH) in
Section 3C.
tion. If any continuity is not obtained, replace main switch.
Terminal
+B1 +B2 +ACC IG1
Position
OUT
LOCK
LOCK
ACC
IN
IN
ON
ON
START
START
IG2
ST
K1
K2

Hide quick links:

Advertisement

Chapters

loading