Download Print this page

Suzuki GA413 Service Manual page 321

Hide thumbs Also See for GA413:

Advertisement

TIMING BELT AND BELT TENSIONER
1. Drive belt
2. Crankshaft pulley
3. A / C compressor
1. Pulley bolt
REMOVAL
1) Disconnect negative cable at battery.
2) Drain engine coolant and remove water hoses and brake boost-
er hose from water hose bracket.
3) Remove generator belt and A/C compressor belt, if equipped.
4) Remove water pump pulley.
5) Remove crankshaft pulley by removing 5 pulley bolts.
6) Remove water hose bracket with clamp and then timing belt
outside cover.
ENGINE MECHANICAL 6A-15
1. Timing belt
2. Tensioner
3. Tensioner plate
4. Tensioner spring
5. Camshaft timing pulley
6. Tensioner bolt
7. Pulley bolt
8. Seal
9. Inside cover seal
10. Inside cover
11. Outside cover seal
12. Outside cover
13. Tensioner stud
14. Water hose bracket

Hide quick links:

Advertisement

Chapters

loading