Download Print this page

Suzuki GA413 Service Manual page 940

Hide thumbs Also See for GA413:

Advertisement

6F-8 IGNITION SYSTEM
SPARK PLUG
1) Pull out high-tension cord by gripping its cap and then remove
spark plugs.
2) Inspect them for:
D Electrode wear
D Carbon deposits
D Insulator damage
3) If any abnormality is found, adjust air gap, clean with spark plug
cleaner or replace them with specified new plugs.
Spark plug air gap "a" : 0.7 – 0.8 mm (0.028 – 0.031 in.)
Spark plug type:
4) Install spark plug and torque them to specification .
Tightening Torque for spark plug
28 N·m (2.8 kg-m, 20.0 lb-ft)
5) Install high-tension cord securely by gripping its cap.
CKP SENSOR
Refer to Section 6E for removal, inspection and installation.
IGNITION TIMING
NOTE:
D Basically ignition timing is not adjustable. If ignition timing
is out of specification, check system related parts.
D Before starting engine, shift transmission to "Neutral" and
set parking brake.
INSPECTION
1) When using SUZUKI scan tool, connect SUZUKI scan tool to
DLC with ignition switch OFF.
Special Tool
(A): 09931-76011 (SUZUKI scan tool)
(B): Mass storage cartridge
(C): 09931-76030 (16/14 pin DLC cable)
2) Start engine and warm it up to normal operating temperature.
3) Make sure that all of electrical loads except ignition are
switched off.
4) Check to be sure that idle speed is within specification.
(Refer to Section 6E)
1. Scan tool
NGK
BKR6E
DENSO
K20PR-U

Hide quick links:

Advertisement

Chapters

loading