Download Print this page

Suzuki GA413 Service Manual page 250

Hide thumbs Also See for GA413:

Advertisement

5-54 BRAKES
1. LSPV stay
2. Floor panel
2) Torque each bolt and nut to specification as indicated respec-
tively in figure.
Tightening Torque
(a): 23 N·m (2.3 kg-m, 17.0 lb-ft)
(b): 16 N·m (1.6 kg-m, 12.0 lb-ft)
(c): 7.5 N·m (0.75 kg-m, 5.5 lb-ft)
3) Upon completion of installation, fill reservoir tank with specified
fluid and bleed air from brake system.
NOTE:
Make sure to bleed air from LSPV bleeder without fail.
4) After bleeding air, check that LSPV in installed properly by refer-
ring to following INSPECTION & ADJUSTMENT section and
perform FLUID PRESSURE TEST.

Hide quick links:

Advertisement

Chapters

loading