Download Print this page

Suzuki GA413 Service Manual page 941

Hide thumbs Also See for GA413:

Advertisement

1. Monitor connector
2. Fuse box
5) Fix ignition timing to initial one as follows:
[Using SUZUKI scan tool]
Select "MISC TEST" mode on SUZUKI scan tool and fix ignition
timing to initial one.
[Not using SUZUKI scan tool] (Vehicle without EGR valve)
Disconnect scan tool from DLC, and connect "D" and "E" termi-
nals of monitor connector or "E" terminal to body ground by us-
ing service wire so that ignition timing is fixed on initial one.
D: Ground terminal
E: Test switch terminal
6) Open the engine service hole cover behind the front seats and
remove the inspection hole cap on the transmission case to ob-
serve ignition timing.
7) Using the timing light, check that ignition timing is within specifi-
cation.
Initial ignition timing (Test
switch terminal grounded or
fixed with SUZUKI scan tool)
Ignition order
Special Tool
(A): 09930-76420
1. No.1 spark plug
IGNITION SYSTEM 6F-9
: 5 " 35 BTDC at idle speed
: 1-3-4-2

Hide quick links:

Advertisement

Chapters

loading