2
A sub-screen will appear to confirm the shutdown of the LPAR manager
.
system. Select "Yes" and press [Enter].
3
A sub-screen will appear, saying that the LPAR manager system is
.
shutting down. It will take a couple of minutes before the power supply
for the server blade is shut off. Once the LPAR manager shutdown has
begun, no operation on the LPAR manager screens is available.
5-68
Hitachi Compute Blade 500 Series Logical partitioning manager User's Guide
Figure 5-51 LPAR manager Shutdown Screen
Figure 5-52 LPAR manager Shutdown Confirmation Screen
Setup of LPAR manager