Upgrading Or Replacing Processors; Required Tools; Preliminary Steps - Fujitsu PRIMERGY RX300 S7 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX300 S7:
Table of Contents

Advertisement

"Enabling SVOM boot watchdog functionality" on page 101
Ê
"Enabling BitLocker functionality" on page 107
Ê
11.4

Upgrading or replacing processors

Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.

11.4.1 Required tools

Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
Upgrading or replacing the processor: tool-less

11.4.2 Preliminary steps

Perform the following procedures:
"Disabling BitLocker functionality" on page 85
Ê
"Disabling SVOM boot watchdog functionality" on page 86
Ê
"Locating the defective server" on page 56
Ê
RX300 S7
Upgrade and Maintenance Manual
Processors
313

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents